Skip to content

Pull requests: openshift/origin

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

Wait for the UDN namespaces to have SA's created do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#29522 opened Feb 3, 2025 by tssurya Loading…
NO-JIRA: network, virt: Retry virtctl console cmd on err acknowledge-critical-fixes-only Indicates if the issuer of the label is OK with the policy. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#29520 opened Feb 3, 2025 by qinqon Loading…
[release-4.18] OCPBUGS-48389: only provision workloads when network creation has started approved Indicates a PR has been approved by an approver from all required OWNERS files. backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#29413 opened Jan 9, 2025 by openshift-cherrypick-robot Loading…
ProTip! no:milestone will show everything without a milestone.