Skip to content

Conversation

@pkoutsovasilis
Copy link
Contributor

@pkoutsovasilis pkoutsovasilis commented Aug 1, 2025

What does this PR do?

This PR removes the pinned AGENT_VERSION, AGENT_PACKAGE_VERSION, and BEAT_VERSION values from the CI environment and updates the .package-version file to 9.1.1.

It also re-enables the upgrade_broken_package_test.go test that was previously skipped due to reliance on pinned versions, since that constraint is now resolved.

Also, I had to bump beats dependency to the commit of 9.1.1 DRA and this required some extra changes in TestGetOtelConfig unit-test

PS: as discussed #8978 (comment) a review from observablt-ci and observablt-ci-contractors is not required (cc @ebeahan @pierrehilbert )

Why is it important?

The version pinning was introduced as a temporary workaround to support the 9.1.0 release. Now that 9.1.1 DRA is released, we are reverting to an unpinned state.

Checklist

  • I have read and understood the pull request guidelines of this project.
  • My code follows the style guidelines of this project
  • I have commented my code, particularly in hard-to-understand areas
  • I have made corresponding changes to the documentation
  • I have made corresponding change to the default configuration files
  • I have added tests that prove my fix is effective or that my feature works
  • I have added an entry in ./changelog/fragments using the changelog tool
  • I have added an integration test or an E2E test

Disruptive User Impact

None. This only impacts internal CI setup and test gating. End users are not affected.

How to test this PR locally

Open a draft PR 🙂

Related issues

  • N/A

@pkoutsovasilis pkoutsovasilis force-pushed the ci/91_revert_agent_pinning branch from 0f3cb0b to 2932c32 Compare August 4, 2025 22:22
@elastic-sonarqube
Copy link

@elasticmachine
Copy link
Collaborator

💚 Build Succeeded

History

cc @pkoutsovasilis

@pkoutsovasilis pkoutsovasilis marked this pull request as ready for review August 5, 2025 06:06
@pkoutsovasilis pkoutsovasilis requested review from a team as code owners August 5, 2025 06:06
@pkoutsovasilis pkoutsovasilis requested review from kaanyalti and ycombinator and removed request for a team August 5, 2025 06:06
@elasticmachine
Copy link
Collaborator

Pinging @elastic/elastic-agent-control-plane (Team:Elastic-Agent-Control-Plane)

@pkoutsovasilis pkoutsovasilis merged commit c70833b into elastic:9.1 Aug 5, 2025
19 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

Projects

None yet

Development

Successfully merging this pull request may close these issues.

4 participants