Parse the contents of a P6 .xer file into a Python object
-
Updated
May 24, 2026 - Python
Parse the contents of a P6 .xer file into a Python object
Project scheduling and earned value control for Python: CPM, PERT with Monte Carlo schedule risk, minimum-cost crashing, EVM and earned schedule. Validated against published reference values.
Weekly Plan vs Actual dashboard for engineering/construction projects. Power BI (DAX/modeling), variance hotspots and a simple pace index. Demo data included.
MeridianIQ - The intelligence standard for project schedules. Open-source schedule intelligence from validation to prediction
Project-controls assurance engine for P6, cost, change, and risk data with reproducible evidence.
This project aims to assess construction cost at completion, known as EAC, using artificial intelligence to take into account past data and provide accurate estimations
An end-to-end data pipeline built using Python (Pandas/NumPy), SQLite window functions, and Power BI to analyze heavy machinery utilization rates and optimize construction site fuel consumption.
Construction workflow analytics case study covering RFIs, change orders, cycle time, bottlenecks, commercial exposure, SQL, Python, Excel, Power BI, and Tableau.
An automated construction cost control pipeline that manages Bill of Quantities (BOQ) text data in SQLite, triggers autonomous Python exception scripts with SMTP email alerts for 10% budget breaches, and visualizes financial overruns in Power BI.
Generate Excel S-curve and Earned Value project-control workbooks from progress CSVs. Live formulas, planner conventions, and documented Excel chart gotchas.
Construction machine-learning case study predicting cost overruns and schedule delays with Python, SQL, SQLite, Excel, Power BI, Tableau, explainability, and model governance.
End-to-end data analytics case study: early-warning analysis of cost and schedule performance across a synthetic 75-project, $5.83B construction portfolio. SQL, Python, earned-value analysis.
WBS Cost Estimation Tool developed a desktop‑based Work Breakdown Structure (WBS) and Cost Breakdown Structure (CBS) estimation tool that supports structured cost entry, versioned change tracking, and comparison of estimates against actuals across the project lifecycle.