Open
Description
Description:
When a customer creates a draft challenge and then clicks Start Work and creates another draft challenge, the first draft challenge is getting overwritten. This is occurring in Prod Environment as well.
Note: The draft challenges are not getting overwritten if one draft challenge is created, then logged out and logged in and create another Draft challenge