Skip to content

Milestone: v0.10.0, durability and scope #69

Description

@tamnd

Tracking issue for the v0.10.0 milestone. Plan lives in notes/Spec/2215/08-roadmap.md section 6.

Goal

Make the long runs trustworthy and stop half committing to the side projects.

Checklist

Correctness under scale:

Confidence:

Scope decisions, both recommended as document the ceiling and stop, both reversible later:

Ergonomics:

Ship gate for v0.10.0

  • coverage floors enforced in CI
  • every documented flag exists
  • every command's runtime dependencies are stated and true
  • the exit codes documented, which turned out to be seven and not four
  • no subsystem is sitting between demo and production without saying which it is

Process

Every PR that lands against this milestone gets a comment on this issue with the PR number and one line on what changed, and the matching checklist box is ticked when the linked issue closes. Automated by .github/workflows/milestone-tracker.yml.

Metadata

Metadata

Assignees

No one assigned

    Labels

    Projects

    No projects

    Milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions