Skip to content

upgrade/ retire psychz exit node #28

Open
@jhpoelen

Description

@jhpoelen

As discussed in #8 (comment) and related threads, the current installation of the psychz exit node has to run an older version of Debian (without security patches) in order to allow unpatched home nodes to create exit node tunnels.

At time of writing (11 April 2018) 15 home nodes are connecting to the psychz exit node. These nodes need to be upgrade before being able to upgrade or retire this exit node.

If the exit node is upgraded/ retired before that, the home nodes will be unable to create tunnels without physical access to the nodes. This means that the home nodes would not able to provide open internet access unless they mesh with neighboring nodes with a route to the internet.

Metadata

Metadata

Assignees

No one assigned

    Labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions