chore(deps): lock file maintenance #268
test.yml
on: pull_request
Matrix: test_matrix
test_dev
7s
test
0s
Annotations
9 errors
test_matrix (20)
Process completed with exit code 1.
|
test_matrix (18.17)
The job was canceled because "_20" failed.
|
test_matrix (18.17)
Process completed with exit code 1.
|
test_dev
Process completed with exit code 1.
|
test_matrix (21)
The job was canceled because "_20" failed.
|
test_matrix (21)
The operation was canceled.
|
test_matrix (20.6.1)
The job was canceled because "_20" failed.
|
test_matrix (20.6.1)
Process completed with exit code 1.
|
test
Process completed with exit code 1.
|