Skip to content

Conversation

czeslavo
Copy link
Contributor

@czeslavo czeslavo commented Sep 1, 2025

Description of your changes: Updates ScyllaDB version 2025.3.0.

Which issue is resolved by this Pull Request:
Resolves #2825.

Copy link
Contributor

Skipping CI for Draft Pull Request.
If you want CI signal for your change, please convert it to an actual PR.
You can still manually trigger a test run with /test all

@scylla-operator-bot scylla-operator-bot bot added the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Sep 1, 2025
Copy link
Contributor

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by: czeslavo
Once this PR has been reviewed and has the lgtm label, please assign rzetelskik for approval. For more information see the Code Review Process.

The full list of commands accepted by this bot can be found here.

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@scylla-operator-bot scylla-operator-bot bot added do-not-merge/needs-kind Indicates a PR lacks a `kind/foo` label and requires one. needs-priority Indicates a PR lacks a `priority/foo` label and requires one. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. labels Sep 1, 2025
@czeslavo
Copy link
Contributor Author

czeslavo commented Sep 1, 2025

/test images
/test all

@rzetelskik
Copy link
Member

rzetelskik commented Sep 1, 2025

You'll need to use our golang image to uodate the manifests as it's using Maciej's fork of operator-sdk.
Please also run the multi-dc suite at least a couple of times to see if the CI doesn't degrade further due to scylladb/scylladb#25410.

@scylla-operator-bot scylla-operator-bot bot added size/S Denotes a PR that changes 10-29 lines, ignoring generated files. and removed size/L Denotes a PR that changes 100-499 lines, ignoring generated files. labels Sep 1, 2025
@czeslavo
Copy link
Contributor Author

czeslavo commented Sep 1, 2025

/test images
/retest

@czeslavo
Copy link
Contributor Author

czeslavo commented Sep 1, 2025

/test images
/test all
/test e2e-gke-multi-datacenter-parallel

@czeslavo
Copy link
Contributor Author

czeslavo commented Sep 1, 2025

@czeslavo: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:
Test name Commit Details Required Rerun command
ci/prow/e2e-gke-parallel 70d5ded link true /test e2e-gke-parallel

Full PR test history. Your PR dashboard.

Known flake.
/retest

@czeslavo
Copy link
Contributor Author

czeslavo commented Sep 1, 2025

We're hitting Startup failed: std::runtime_error (the topology coordinator rejected request to join the cluster: request canceled because some required nodes are dead) again. 7/12 multi-DC test cases have failed: https://prow.scylla-operator.scylladb.com/view/gs/scylla-operator-prow/pr-logs/pull/scylladb_scylla-operator/2923/pull-scylla-operator-master-e2e-gke-multi-datacenter-parallel/1962450017948012544

I think we should try to prioritize scylladb/scylladb#25410 as it's not clear what the path forward is for us to fix this issue. @mflendrich @rzetelskik

@czeslavo
Copy link
Contributor Author

czeslavo commented Sep 1, 2025

/test images
/retest

@czeslavo
Copy link
Contributor Author

czeslavo commented Sep 5, 2025

/test images
/test e2e-gke-multi-datacenter-parallel

Copy link
Contributor

@czeslavo: The following test failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/e2e-gke-multi-datacenter-parallel ffc50cb link true /test e2e-gke-multi-datacenter-parallel

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

Copy link
Contributor

The Scylla Operator project currently lacks enough contributors to adequately respond to all PRs.

This bot triages PRs according to the following rules:

  • After 30d of inactivity, lifecycle/stale is applied
  • After 30d of inactivity since lifecycle/stale was applied, lifecycle/rotten is applied
  • After 30d of inactivity since lifecycle/rotten was applied, the PR is closed

You can:

  • Mark this PR as fresh with /remove-lifecycle stale
  • Close this PR with /close
  • Offer to help out

/lifecycle stale

@scylla-operator-bot scylla-operator-bot bot added the lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. label Oct 5, 2025
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
do-not-merge/needs-kind Indicates a PR lacks a `kind/foo` label and requires one. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale. needs-priority Indicates a PR lacks a `priority/foo` label and requires one. size/S Denotes a PR that changes 10-29 lines, ignoring generated files.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

Support ScyllaDB 2025.3
2 participants