Skip to content

Pull requests: rust-lang/rust

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Port #[coroutine] to the new attribute system A-attributes Area: Attributes (`#[…]`, `#![…]`) S-waiting-on-bors Status: Waiting on bors to run and complete tests. Bors will change the label on completion. T-compiler Relevant to the compiler team, which will review and decide on the PR/issue.
#144794 opened Aug 1, 2025 by scrabsha Loading…
Rewrite the new attribute argument parser A-attributes Area: Attributes (`#[…]`, `#![…]`) I-lang-nominated Nominated for discussion during a lang team meeting. needs-fcp This change is insta-stable, or significant enough to need a team FCP to proceed. P-lang-drag-1 Lang team prioritization drag level 1. https://rust-lang.zulipchat.com/#narrow/channel/410516-t-lang perf-regression Performance regression. S-waiting-on-review Status: Awaiting review from the assignee but also interested parties. T-compiler Relevant to the compiler team, which will review and decide on the PR/issue. T-lang Relevant to the language team
#144689 opened Jul 30, 2025 by JonathanBrouwer Loading…
Port #[macro_export] to the new attribute parsing infrastructure A-attributes Area: Attributes (`#[…]`, `#![…]`) disposition-merge This issue / PR is in PFCP or FCP with a disposition to merge it. finished-final-comment-period The final comment period is finished for this PR / Issue. I-lang-radar Items that are on lang's radar and will need eventual work or consideration. needs-fcp This change is insta-stable, or significant enough to need a team FCP to proceed. S-waiting-on-bors Status: Waiting on bors to run and complete tests. Bors will change the label on completion. T-clippy Relevant to the Clippy team. T-lang Relevant to the language team T-rustdoc-frontend Relevant to the rustdoc-frontend team, which will review and decide on the web UI/UX output. to-announce Announce this issue on triage meeting
#143857 opened Jul 12, 2025 by Periodic1911 Loading…
Port #[should_panic] to the new attribute parsing infrastructure A-attributes Area: Attributes (`#[…]`, `#![…]`) disposition-merge This issue / PR is in PFCP or FCP with a disposition to merge it. final-comment-period In the final comment period and will be merged soon unless new substantive objections are raised. I-lang-radar Items that are on lang's radar and will need eventual work or consideration. needs-fcp This change is insta-stable, or significant enough to need a team FCP to proceed. S-waiting-on-review Status: Awaiting review from the assignee but also interested parties. T-lang Relevant to the language team
#143808 opened Jul 11, 2025 by JonathanBrouwer Loading…
Create AttrTarget for attribute parsing A-attributes Area: Attributes (`#[…]`, `#![…]`) S-waiting-on-review Status: Awaiting review from the assignee but also interested parties. T-compiler Relevant to the compiler team, which will review and decide on the PR/issue.
#143284 opened Jul 1, 2025 by mejrs Loading…
Port #[link] to the new attribute parsing infrastructure A-attributes Area: Attributes (`#[…]`, `#![…]`) A-run-make Area: port run-make Makefiles to rmake.rs disposition-merge This issue / PR is in PFCP or FCP with a disposition to merge it. I-lang-nominated Nominated for discussion during a lang team meeting. needs-fcp This change is insta-stable, or significant enough to need a team FCP to proceed. P-lang-drag-1 Lang team prioritization drag level 1. https://rust-lang.zulipchat.com/#narrow/channel/410516-t-lang proposed-final-comment-period Proposed to merge/close by relevant subteam, see T-<team> label. Will enter FCP once signed off. S-waiting-on-review Status: Awaiting review from the assignee but also interested parties. T-lang Relevant to the language team
#143193 opened Jun 29, 2025 by JonathanBrouwer Loading…
start properly testing attributes in positions A-attributes Area: Attributes (`#[…]`, `#![…]`) S-waiting-on-review Status: Awaiting review from the assignee but also interested parties. T-compiler Relevant to the compiler team, which will review and decide on the PR/issue.
#140948 opened May 12, 2025 by mejrs Draft
ProTip! no:milestone will show everything without a milestone.