This release corresponds to the production build of 18 dynamics labs experiments in the School of Engineering, University of Edinburgh in September 2025.
Firmware includes an +/- 8g limit on acceleration that is appropriate for the beam lengths associated with the above set of experiments.
User interfaces included are: default (full control and data for experiment available) and analytics (default + logging)