Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

bazel: remove timeout #36257

Merged
merged 2 commits into from
Jul 18, 2022
Merged

bazel: remove timeout #36257

merged 2 commits into from
Jul 18, 2022

Conversation

xiongjiwei
Copy link
Contributor

@xiongjiwei xiongjiwei commented Jul 18, 2022

What problem does this PR solve?

we have timeout control for every single test file, no need this anymore

What is changed and how it works?

Check List

Tests

  • Unit test
  • Integration test
  • Manual test (add detailed scripts or steps below)
  • No code

Release note

Please refer to Release Notes Language Style Guide to write a quality release note.

None

@ti-chi-bot
Copy link
Member

ti-chi-bot commented Jul 18, 2022

[REVIEW NOTIFICATION]

This pull request has been approved by:

  • hawkingrei
  • tangenta

To complete the pull request process, please ask the reviewers in the list to review by filling /cc @reviewer in the comment.
After your PR has acquired the required number of LGTMs, you can assign this pull request to the committer in the list by filling /assign @committer in the comment to help you merge this pull request.

The full list of commands accepted by this bot can be found here.

Reviewer can indicate their review by submitting an approval review.
Reviewer can cancel approval by submitting a request changes review.

@ti-chi-bot ti-chi-bot added do-not-merge/needs-linked-issue release-note-none Denotes a PR that doesn't merit a release note. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. labels Jul 18, 2022
@xiongjiwei xiongjiwei marked this pull request as ready for review July 18, 2022 04:03
@ti-chi-bot ti-chi-bot removed the do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. label Jul 18, 2022
@xiongjiwei xiongjiwei added the skip-issue-check Indicates that a PR no need to check linked issue. label Jul 18, 2022
@ti-chi-bot ti-chi-bot added the status/LGT1 Indicates that a PR has LGTM 1. label Jul 18, 2022
@sre-bot
Copy link
Contributor

sre-bot commented Jul 18, 2022

@ti-chi-bot ti-chi-bot added status/LGT2 Indicates that a PR has LGTM 2. and removed status/LGT1 Indicates that a PR has LGTM 1. labels Jul 18, 2022
@hawkingrei
Copy link
Member

/merge

@ti-chi-bot
Copy link
Member

This pull request has been accepted and is ready to merge.

Commit hash: a738b8a

@ti-chi-bot ti-chi-bot added the status/can-merge Indicates a PR has been approved by a committer. label Jul 18, 2022
@ti-chi-bot ti-chi-bot merged commit 3c2a5cf into pingcap:master Jul 18, 2022
@sre-bot
Copy link
Contributor

sre-bot commented Jul 18, 2022

TiDB MergeCI notify

🔴 Bad News! New failing [1] after this pr merged.
These new failed integration tests seem to be caused by the current PR, please try to fix these new failed integration tests, thanks!

CI Name Result Duration Compare with Parent commit
idc-jenkins-ci-tidb/integration-ddl-test 🟥 failed 1, success 5, total 6 14 min New failing
idc-jenkins-ci-tidb/tics-test 🔴 failed 1, success 0, total 1 2 min 24 sec Existing failure
idc-jenkins-ci/integration-cdc-test 🟢 all 36 tests passed 26 min Existing passed
idc-jenkins-ci-tidb/integration-common-test 🟢 all 11 tests passed 23 min Existing passed
idc-jenkins-ci-tidb/common-test 🟢 all 12 tests passed 13 min Existing passed
idc-jenkins-ci-tidb/sqllogic-test-1 🟢 all 26 tests passed 5 min 32 sec Existing passed
idc-jenkins-ci-tidb/sqllogic-test-2 🟢 all 28 tests passed 5 min 23 sec Existing passed
idc-jenkins-ci-tidb/mybatis-test 🟢 all 1 tests passed 4 min 25 sec Existing passed
idc-jenkins-ci-tidb/integration-compatibility-test 🟢 all 1 tests passed 3 min 41 sec Existing passed
idc-jenkins-ci-tidb/plugin-test 🟢 build success, plugin test success 4min Existing passed

@xiongjiwei xiongjiwei deleted the timeout branch September 1, 2022 03:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
release-note-none Denotes a PR that doesn't merit a release note. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. skip-issue-check Indicates that a PR no need to check linked issue. status/can-merge Indicates a PR has been approved by a committer. status/LGT2 Indicates that a PR has LGTM 2.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

5 participants