Skip to content

Conversation

@openshift-bot
Copy link
Contributor

The staging/ and vendor/ directories have been synchronized from the upstream repositories, pulling in the following commits:

Date Commit Author Message
2025-10-28 18:16:59 operator-framework/operator-lifecycle-manager@5c80506 dependabot[bot] 🌱 Bump github.com/onsi/ginkgo/v2 from 2.26.0 to 2.27.2 (#3690)
2025-10-28 18:19:42 operator-framework/operator-lifecycle-manager@41b6a7d dependabot[bot] Bump actions/upload-artifact from 4 to 5 (#3688)
2025-10-28 18:22:26 operator-framework/operator-lifecycle-manager@2dac489 dependabot[bot] Bump actions/download-artifact from 5 to 6 (#3689)

This pull request is expected to merge without any human intervention. If tests are failing here, changes must land upstream to fix any issues so that future downstreaming efforts succeed.

/cc @openshift/openshift-team-operator-framework

dependabot bot added 3 commits October 29, 2025 00:02
Bumps [github.com/onsi/ginkgo/v2](https://github.com/onsi/ginkgo) from 2.26.0 to 2.27.2.
- [Release notes](https://github.com/onsi/ginkgo/releases)
- [Changelog](https://github.com/onsi/ginkgo/blob/master/CHANGELOG.md)
- [Commits](onsi/ginkgo@v2.26.0...v2.27.2)

---
updated-dependencies:
- dependency-name: github.com/onsi/ginkgo/v2
  dependency-version: 2.27.2
  dependency-type: direct:production
  update-type: version-update:semver-minor
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Upstream-repository: operator-lifecycle-manager
Upstream-commit: 5c80506b068ab4bd5873aba7f370497da0088a0d
Bumps [actions/upload-artifact](https://github.com/actions/upload-artifact) from 4 to 5.
- [Release notes](https://github.com/actions/upload-artifact/releases)
- [Commits](actions/upload-artifact@v4...v5)

---
updated-dependencies:
- dependency-name: actions/upload-artifact
  dependency-version: '5'
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Upstream-repository: operator-lifecycle-manager
Upstream-commit: 41b6a7d29613b95f97ec739e424293862c5a4718
Bumps [actions/download-artifact](https://github.com/actions/download-artifact) from 5 to 6.
- [Release notes](https://github.com/actions/download-artifact/releases)
- [Commits](actions/download-artifact@v5...v6)

---
updated-dependencies:
- dependency-name: actions/download-artifact
  dependency-version: '6'
  dependency-type: direct:production
  update-type: version-update:semver-major
...

Signed-off-by: dependabot[bot] <support@github.com>
Co-authored-by: dependabot[bot] <49699333+dependabot[bot]@users.noreply.github.com>
Upstream-repository: operator-lifecycle-manager
Upstream-commit: 2dac48906bbd2ebd9b841fc8b98774e97d1d4d20
@openshift-bot openshift-bot added approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. labels Oct 29, 2025
@openshift-ci-robot
Copy link

@openshift-bot: This pull request explicitly references no jira issue.

In response to this:

The staging/ and vendor/ directories have been synchronized from the upstream repositories, pulling in the following commits:

Date Commit Author Message
2025-10-28 18:16:59 operator-framework/operator-lifecycle-manager@5c80506 dependabot[bot] 🌱 Bump github.com/onsi/ginkgo/v2 from 2.26.0 to 2.27.2 (#3690)
2025-10-28 18:19:42 operator-framework/operator-lifecycle-manager@41b6a7d dependabot[bot] Bump actions/upload-artifact from 4 to 5 (#3688)
2025-10-28 18:22:26 operator-framework/operator-lifecycle-manager@2dac489 dependabot[bot] Bump actions/download-artifact from 5 to 6 (#3689)

This pull request is expected to merge without any human intervention. If tests are failing here, changes must land upstream to fix any issues so that future downstreaming efforts succeed.

/cc @openshift/openshift-team-operator-framework

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot openshift-ci-robot added the jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. label Oct 29, 2025
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Oct 29, 2025

@openshift-bot: GitHub didn't allow me to request PR reviews from the following users: openshift/openshift-team-operator-framework.

Note that only openshift members and repo collaborators can review this PR, and authors cannot review their own PRs.

In response to this:

The staging/ and vendor/ directories have been synchronized from the upstream repositories, pulling in the following commits:

Date Commit Author Message
2025-10-28 18:16:59 operator-framework/operator-lifecycle-manager@5c80506 dependabot[bot] 🌱 Bump github.com/onsi/ginkgo/v2 from 2.26.0 to 2.27.2 (#3690)
2025-10-28 18:19:42 operator-framework/operator-lifecycle-manager@41b6a7d dependabot[bot] Bump actions/upload-artifact from 4 to 5 (#3688)
2025-10-28 18:22:26 operator-framework/operator-lifecycle-manager@2dac489 dependabot[bot] Bump actions/download-artifact from 5 to 6 (#3689)

This pull request is expected to merge without any human intervention. If tests are failing here, changes must land upstream to fix any issues so that future downstreaming efforts succeed.

/cc @openshift/openshift-team-operator-framework

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Oct 29, 2025

[APPROVALNOTIFIER] This PR is APPROVED

Approval requirements bypassed by manually added approval.

This pull-request has been approved by: openshift-bot

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

1 similar comment
@openshift-ci
Copy link
Contributor

openshift-ci bot commented Oct 29, 2025

[APPROVALNOTIFIER] This PR is APPROVED

Approval requirements bypassed by manually added approval.

This pull-request has been approved by: openshift-bot

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@jianzhangbjz
Copy link
Contributor

/verified by pass

@openshift-ci-robot openshift-ci-robot added the verified Signifies that the PR passed pre-merge verification criteria label Oct 29, 2025
@openshift-ci-robot
Copy link

@jianzhangbjz: This PR has been marked as verified by pass.

In response to this:

/verified by pass

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot
Copy link

/retest-required

Remaining retests: 0 against base HEAD 25904d8 and 2 for PR HEAD c00245c in total

@jianzhangbjz
Copy link
Contributor

/retest-required

@openshift-ci
Copy link
Contributor

openshift-ci bot commented Oct 30, 2025

@openshift-bot: all tests passed!

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@openshift-merge-bot openshift-merge-bot bot merged commit 4d2698b into openshift:main Oct 30, 2025
16 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. verified Signifies that the PR passed pre-merge verification criteria

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants