Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

OCPBUGS-45551: Updating ose-installer-altinfra-container image to be consistent with ART for 4.19 #9275

Conversation

openshift-bot
Copy link
Contributor

@openshift-bot openshift-bot commented Dec 4, 2024

Updating ose-installer-altinfra-container image to be consistent with ART for 4.19
TLDR:
Product builds by ART can be configured for different base and builder images than corresponding CI
builds. This automated PR requests a change to CI configuration to align with ART's configuration;
please take steps to merge it quickly or contact ART to coordinate changes.

The configuration in the following ART component metadata is driving this alignment request:
ose-installer-altinfra.yml.

Detail:

This repository is out of sync with the downstream product builds for this component. The CI
configuration for at least one image differs from ART's expected product configuration. This should
be addressed to ensure that the component's CI testing accurate reflects what customers will
experience.

Most of these PRs are opened as an ART-driven proposal to migrate base image or builder(s) to a
different version, usually prior to GA. The intent is to effect changes in both configurations
simultaneously without breaking either CI or ART builds, so usually ART builds are configured to
consider CI as canonical and attempt to match CI config until the PR merges to align both. ART may
also configure changes in GA releases with CI remaining canonical for a brief grace period to enable
CI to succeed and the alignment PR to merge. In either case, ART configuration will be made
canonical at some point (typically at branch-cut before GA or release dev-cut after GA), so it is
important to align CI configuration as soon as possible.

PRs are also triggered when CI configuration changes without ART coordination, for instance to
change the number of builder images or to use a different golang version. These changes should be
coordinated with ART; whether ART configuration is canonical or not, preferably it would be updated
first to enable the changes to occur simultaneously in both CI and ART at the same time. This also
gives ART a chance to validate the intended changes first. For instance, ART compiles most
components with the Golang version being used by the control plane for a given OpenShift release.
Exceptions to this convention (i.e. you believe your component must be compiled with a Golang
version independent from the control plane) must be granted by the OpenShift staff engineers and
communicated to the ART team.

Roles & Responsibilities:

  • Component owners are responsible for ensuring these alignment PRs merge with passing
    tests OR that necessary metadata changes are reported to the ART team: @release-artists
    in #forum-ocp-art on Slack. If necessary, the changes required by this pull request can be
    introduced with a separate PR opened by the component team. Once the repository is aligned,
    this PR will be closed automatically.
  • In particular, it could be that a job like verify-deps is complaining. In that case, please open
    a new PR with the dependency issues addressed (and base images bumped). ART-9595 for reference.
  • Patch-manager or those with sufficient privileges within this repository may add
    any required labels to ensure the PR merges once tests are passing. In cases where ART config is
    canonical, downstream builds are already being built with these changes, and merging this PR
    only improves the fidelity of our CI. In cases where ART config is not canonical, this provides
    a grace period for the component team to align their CI with ART's configuration before it becomes
    canonical in product builds.

ART has been configured to reconcile your CI build root image (see https://docs.ci.openshift.org/docs/architecture/ci-operator/#build-root-image).
In order for your upstream .ci-operator.yaml configuration to be honored, you must set the following in your openshift/release ci-operator configuration file:

build_root:
  from_repository: true

Change behavior of future PRs:

  • In case you just want to follow the base images that ART suggests, you can configure additional labels to be
    set up automatically. This means that such a PR would merge without human intervention (and awareness!) in the future.
    To do so, open a PR to set the auto_label attribute in the image configuration. Example
  • You can set a commit prefix, like UPSTREAM: <carry>: . An example.

If you have any questions about this pull request, please reach out to @release-artists in the #forum-ocp-art coreos slack channel.

@openshift-bot
Copy link
Contributor Author

@openshift-bot openshift-bot added backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. bugzilla/valid-bug Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting. cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager. labels Dec 4, 2024
@openshift-bot openshift-bot changed the title Updating ose-installer-altinfra-container image to be consistent with ART for 4.19 OCPBUGS-45551: Updating ose-installer-altinfra-container image to be consistent with ART for 4.19 Dec 4, 2024
@openshift-ci-robot
Copy link
Contributor

@openshift-bot: An error was encountered updating to the POST state for bug OCPBUGS-45551 on the Jira server at https://issues.redhat.com/. No known errors were detected, please see the full error message for details.

Full error message. Error marking step #34249340 finished: root cause: Tried to update an entity that does not exist.: request failed. Please analyze the request body for more details. Status code: 400:

Please contact an administrator to resolve this issue, then request a bug refresh with /jira refresh.

In response to this:

Updating ose-installer-altinfra-container image to be consistent with ART for 4.19
TLDR:
Product builds by ART can be configured for different base and builder images than corresponding CI
builds. This automated PR requests a change to CI configuration to align with ART's configuration;
please take steps to merge it quickly or contact ART to coordinate changes.

The configuration in the following ART component metadata is driving this alignment request:
ose-installer-altinfra.yml.

Detail:

This repository is out of sync with the downstream product builds for this component. The CI
configuration for at least one image differs from ART's expected product configuration. This should
be addressed to ensure that the component's CI testing accurate reflects what customers will
experience.

Most of these PRs are opened as an ART-driven proposal to migrate base image or builder(s) to a
different version, usually prior to GA. The intent is to effect changes in both configurations
simultaneously without breaking either CI or ART builds, so usually ART builds are configured to
consider CI as canonical and attempt to match CI config until the PR merges to align both. ART may
also configure changes in GA releases with CI remaining canonical for a brief grace period to enable
CI to succeed and the alignment PR to merge. In either case, ART configuration will be made
canonical at some point (typically at branch-cut before GA or release dev-cut after GA), so it is
important to align CI configuration as soon as possible.

PRs are also triggered when CI configuration changes without ART coordination, for instance to
change the number of builder images or to use a different golang version. These changes should be
coordinated with ART; whether ART configuration is canonical or not, preferably it would be updated
first to enable the changes to occur simultaneously in both CI and ART at the same time. This also
gives ART a chance to validate the intended changes first. For instance, ART compiles most
components with the Golang version being used by the control plane for a given OpenShift release.
Exceptions to this convention (i.e. you believe your component must be compiled with a Golang
version independent from the control plane) must be granted by the OpenShift staff engineers and
communicated to the ART team.

Roles & Responsibilities:

  • Component owners are responsible for ensuring these alignment PRs merge with passing
    tests OR that necessary metadata changes are reported to the ART team: @release-artists
    in #forum-ocp-art on Slack. If necessary, the changes required by this pull request can be
    introduced with a separate PR opened by the component team. Once the repository is aligned,
    this PR will be closed automatically.
  • In particular, it could be that a job like verify-deps is complaining. In that case, please open
    a new PR with the dependency issues addressed (and base images bumped). ART-9595 for reference.
  • Patch-manager or those with sufficient privileges within this repository may add
    any required labels to ensure the PR merges once tests are passing. In cases where ART config is
    canonical, downstream builds are already being built with these changes, and merging this PR
    only improves the fidelity of our CI. In cases where ART config is not canonical, this provides
    a grace period for the component team to align their CI with ART's configuration before it becomes
    canonical in product builds.

ART has been configured to reconcile your CI build root image (see https://docs.ci.openshift.org/docs/architecture/ci-operator/#build-root-image).
In order for your upstream .ci-operator.yaml configuration to be honored, you must set the following in your openshift/release ci-operator configuration file:

build_root:
 from_repository: true

Change behavior of future PRs:

  • In case you just want to follow the base images that ART suggests, you can configure additional labels to be
    set up automatically. This means that such a PR would merge without human intervention (and awareness!) in the future.
    To do so, open a PR to set the auto_label attribute in the image configuration. Example
  • You can set a commit prefix, like UPSTREAM: <carry>: . An example.

If you have any questions about this pull request, please reach out to @release-artists in the #forum-ocp-art coreos slack channel.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot openshift-ci-robot added jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. labels Dec 4, 2024
@openshift-ci-robot
Copy link
Contributor

@openshift-bot: This pull request references Jira Issue OCPBUGS-45551, which is valid. The bug has been moved to the POST state.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.19.0) matches configured target version for branch (4.19.0)
  • bug is in the state New, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @gpei

The bug has been updated to refer to the pull request using the external bug tracker.

In response to this:

Updating ose-installer-altinfra-container image to be consistent with ART for 4.19
TLDR:
Product builds by ART can be configured for different base and builder images than corresponding CI
builds. This automated PR requests a change to CI configuration to align with ART's configuration;
please take steps to merge it quickly or contact ART to coordinate changes.

The configuration in the following ART component metadata is driving this alignment request:
ose-installer-altinfra.yml.

Detail:

This repository is out of sync with the downstream product builds for this component. The CI
configuration for at least one image differs from ART's expected product configuration. This should
be addressed to ensure that the component's CI testing accurate reflects what customers will
experience.

Most of these PRs are opened as an ART-driven proposal to migrate base image or builder(s) to a
different version, usually prior to GA. The intent is to effect changes in both configurations
simultaneously without breaking either CI or ART builds, so usually ART builds are configured to
consider CI as canonical and attempt to match CI config until the PR merges to align both. ART may
also configure changes in GA releases with CI remaining canonical for a brief grace period to enable
CI to succeed and the alignment PR to merge. In either case, ART configuration will be made
canonical at some point (typically at branch-cut before GA or release dev-cut after GA), so it is
important to align CI configuration as soon as possible.

PRs are also triggered when CI configuration changes without ART coordination, for instance to
change the number of builder images or to use a different golang version. These changes should be
coordinated with ART; whether ART configuration is canonical or not, preferably it would be updated
first to enable the changes to occur simultaneously in both CI and ART at the same time. This also
gives ART a chance to validate the intended changes first. For instance, ART compiles most
components with the Golang version being used by the control plane for a given OpenShift release.
Exceptions to this convention (i.e. you believe your component must be compiled with a Golang
version independent from the control plane) must be granted by the OpenShift staff engineers and
communicated to the ART team.

Roles & Responsibilities:

  • Component owners are responsible for ensuring these alignment PRs merge with passing
    tests OR that necessary metadata changes are reported to the ART team: @release-artists
    in #forum-ocp-art on Slack. If necessary, the changes required by this pull request can be
    introduced with a separate PR opened by the component team. Once the repository is aligned,
    this PR will be closed automatically.
  • In particular, it could be that a job like verify-deps is complaining. In that case, please open
    a new PR with the dependency issues addressed (and base images bumped). ART-9595 for reference.
  • Patch-manager or those with sufficient privileges within this repository may add
    any required labels to ensure the PR merges once tests are passing. In cases where ART config is
    canonical, downstream builds are already being built with these changes, and merging this PR
    only improves the fidelity of our CI. In cases where ART config is not canonical, this provides
    a grace period for the component team to align their CI with ART's configuration before it becomes
    canonical in product builds.

ART has been configured to reconcile your CI build root image (see https://docs.ci.openshift.org/docs/architecture/ci-operator/#build-root-image).
In order for your upstream .ci-operator.yaml configuration to be honored, you must set the following in your openshift/release ci-operator configuration file:

build_root:
 from_repository: true

Change behavior of future PRs:

  • In case you just want to follow the base images that ART suggests, you can configure additional labels to be
    set up automatically. This means that such a PR would merge without human intervention (and awareness!) in the future.
    To do so, open a PR to set the auto_label attribute in the image configuration. Example
  • You can set a commit prefix, like UPSTREAM: <carry>: . An example.

If you have any questions about this pull request, please reach out to @release-artists in the #forum-ocp-art coreos slack channel.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-ci-robot
Copy link
Contributor

openshift-ci-robot commented Dec 6, 2024

@openshift-bot: This pull request references Jira Issue OCPBUGS-45551, which is valid.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.19.0) matches configured target version for branch (4.19.0)
  • bug is in the state POST, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @gpei

In response to this:

Updating ose-installer-altinfra-container image to be consistent with ART for 4.19
TLDR:
Product builds by ART can be configured for different base and builder images than corresponding CI
builds. This automated PR requests a change to CI configuration to align with ART's configuration;
please take steps to merge it quickly or contact ART to coordinate changes.

The configuration in the following ART component metadata is driving this alignment request:
ose-installer-altinfra.yml.

Detail:

This repository is out of sync with the downstream product builds for this component. The CI
configuration for at least one image differs from ART's expected product configuration. This should
be addressed to ensure that the component's CI testing accurate reflects what customers will
experience.

Most of these PRs are opened as an ART-driven proposal to migrate base image or builder(s) to a
different version, usually prior to GA. The intent is to effect changes in both configurations
simultaneously without breaking either CI or ART builds, so usually ART builds are configured to
consider CI as canonical and attempt to match CI config until the PR merges to align both. ART may
also configure changes in GA releases with CI remaining canonical for a brief grace period to enable
CI to succeed and the alignment PR to merge. In either case, ART configuration will be made
canonical at some point (typically at branch-cut before GA or release dev-cut after GA), so it is
important to align CI configuration as soon as possible.

PRs are also triggered when CI configuration changes without ART coordination, for instance to
change the number of builder images or to use a different golang version. These changes should be
coordinated with ART; whether ART configuration is canonical or not, preferably it would be updated
first to enable the changes to occur simultaneously in both CI and ART at the same time. This also
gives ART a chance to validate the intended changes first. For instance, ART compiles most
components with the Golang version being used by the control plane for a given OpenShift release.
Exceptions to this convention (i.e. you believe your component must be compiled with a Golang
version independent from the control plane) must be granted by the OpenShift staff engineers and
communicated to the ART team.

Roles & Responsibilities:

  • Component owners are responsible for ensuring these alignment PRs merge with passing
    tests OR that necessary metadata changes are reported to the ART team: @release-artists
    in #forum-ocp-art on Slack. If necessary, the changes required by this pull request can be
    introduced with a separate PR opened by the component team. Once the repository is aligned,
    this PR will be closed automatically.
  • In particular, it could be that a job like verify-deps is complaining. In that case, please open
    a new PR with the dependency issues addressed (and base images bumped). ART-9595 for reference.
  • Patch-manager or those with sufficient privileges within this repository may add
    any required labels to ensure the PR merges once tests are passing. In cases where ART config is
    canonical, downstream builds are already being built with these changes, and merging this PR
    only improves the fidelity of our CI. In cases where ART config is not canonical, this provides
    a grace period for the component team to align their CI with ART's configuration before it becomes
    canonical in product builds.

ART has been configured to reconcile your CI build root image (see https://docs.ci.openshift.org/docs/architecture/ci-operator/#build-root-image).
In order for your upstream .ci-operator.yaml configuration to be honored, you must set the following in your openshift/release ci-operator configuration file:

build_root:
 from_repository: true

Change behavior of future PRs:

  • In case you just want to follow the base images that ART suggests, you can configure additional labels to be
    set up automatically. This means that such a PR would merge without human intervention (and awareness!) in the future.
    To do so, open a PR to set the auto_label attribute in the image configuration. Example
  • You can set a commit prefix, like UPSTREAM: <carry>: . An example.

If you have any questions about this pull request, please reach out to @release-artists in the #forum-ocp-art coreos slack channel.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

Copy link
Contributor

@barbacbd barbacbd left a comment

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

/lgtm

@barbacbd
Copy link
Contributor

/retest

@openshift-ci openshift-ci bot added the lgtm Indicates that a PR is ready to be merged. label Jan 16, 2025
@patrickdillon
Copy link
Contributor

/approve
/label acknowledge-critical-fixes-only

@openshift-ci openshift-ci bot added the acknowledge-critical-fixes-only Indicates if the issuer of the label is OK with the policy. label Jan 17, 2025
Copy link
Contributor

openshift-ci bot commented Jan 17, 2025

[APPROVALNOTIFIER] This PR is APPROVED

This pull-request has been approved by: patrickdillon

The full list of commands accepted by this bot can be found here.

The pull request process is described here

Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@openshift-ci openshift-ci bot added the approved Indicates a PR has been approved by an approver from all required OWNERS files. label Jan 17, 2025
@openshift-ci-robot
Copy link
Contributor

/retest-required

Remaining retests: 0 against base HEAD 4fd9f0f and 2 for PR HEAD 422d14a in total

@openshift-ci-robot
Copy link
Contributor

/retest-required

Remaining retests: 0 against base HEAD 5981419 and 1 for PR HEAD 422d14a in total

@openshift-ci-robot
Copy link
Contributor

/retest-required

Remaining retests: 0 against base HEAD cdd054f and 0 for PR HEAD 422d14a in total

Copy link
Contributor

openshift-ci bot commented Jan 18, 2025

@openshift-bot: The following tests failed, say /retest to rerun all failed tests or /retest-required to rerun all mandatory failed tests:

Test name Commit Details Required Rerun command
ci/prow/e2e-vsphere-host-groups-ovn-custom-no-upgrade 422d14a link false /test e2e-vsphere-host-groups-ovn-custom-no-upgrade
ci/prow/okd-scos-e2e-aws-ovn 422d14a link false /test okd-scos-e2e-aws-ovn

Full PR test history. Your PR dashboard.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository. I understand the commands that are listed here.

@openshift-ci-robot
Copy link
Contributor

/hold

Revision 422d14a was retested 3 times: holding

@openshift-ci openshift-ci bot added the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Jan 18, 2025
@openshift-ci-robot
Copy link
Contributor

openshift-ci-robot commented Jan 23, 2025

@openshift-bot: This pull request references Jira Issue OCPBUGS-45551, which is valid.

3 validation(s) were run on this bug
  • bug is open, matching expected state (open)
  • bug target version (4.19.0) matches configured target version for branch (4.19.0)
  • bug is in the state POST, which is one of the valid states (NEW, ASSIGNED, POST)

Requesting review from QA contact:
/cc @gpei

In response to this:

Updating ose-installer-altinfra-container image to be consistent with ART for 4.19
TLDR:
Product builds by ART can be configured for different base and builder images than corresponding CI
builds. This automated PR requests a change to CI configuration to align with ART's configuration;
please take steps to merge it quickly or contact ART to coordinate changes.

The configuration in the following ART component metadata is driving this alignment request:
ose-installer-altinfra.yml.

Detail:

This repository is out of sync with the downstream product builds for this component. The CI
configuration for at least one image differs from ART's expected product configuration. This should
be addressed to ensure that the component's CI testing accurate reflects what customers will
experience.

Most of these PRs are opened as an ART-driven proposal to migrate base image or builder(s) to a
different version, usually prior to GA. The intent is to effect changes in both configurations
simultaneously without breaking either CI or ART builds, so usually ART builds are configured to
consider CI as canonical and attempt to match CI config until the PR merges to align both. ART may
also configure changes in GA releases with CI remaining canonical for a brief grace period to enable
CI to succeed and the alignment PR to merge. In either case, ART configuration will be made
canonical at some point (typically at branch-cut before GA or release dev-cut after GA), so it is
important to align CI configuration as soon as possible.

PRs are also triggered when CI configuration changes without ART coordination, for instance to
change the number of builder images or to use a different golang version. These changes should be
coordinated with ART; whether ART configuration is canonical or not, preferably it would be updated
first to enable the changes to occur simultaneously in both CI and ART at the same time. This also
gives ART a chance to validate the intended changes first. For instance, ART compiles most
components with the Golang version being used by the control plane for a given OpenShift release.
Exceptions to this convention (i.e. you believe your component must be compiled with a Golang
version independent from the control plane) must be granted by the OpenShift staff engineers and
communicated to the ART team.

Roles & Responsibilities:

  • Component owners are responsible for ensuring these alignment PRs merge with passing
    tests OR that necessary metadata changes are reported to the ART team: @release-artists
    in #forum-ocp-art on Slack. If necessary, the changes required by this pull request can be
    introduced with a separate PR opened by the component team. Once the repository is aligned,
    this PR will be closed automatically.
  • In particular, it could be that a job like verify-deps is complaining. In that case, please open
    a new PR with the dependency issues addressed (and base images bumped). ART-9595 for reference.
  • Patch-manager or those with sufficient privileges within this repository may add
    any required labels to ensure the PR merges once tests are passing. In cases where ART config is
    canonical, downstream builds are already being built with these changes, and merging this PR
    only improves the fidelity of our CI. In cases where ART config is not canonical, this provides
    a grace period for the component team to align their CI with ART's configuration before it becomes
    canonical in product builds.

ART has been configured to reconcile your CI build root image (see https://docs.ci.openshift.org/docs/architecture/ci-operator/#build-root-image).
In order for your upstream .ci-operator.yaml configuration to be honored, you must set the following in your openshift/release ci-operator configuration file:

build_root:
 from_repository: true

Change behavior of future PRs:

  • In case you just want to follow the base images that ART suggests, you can configure additional labels to be
    set up automatically. This means that such a PR would merge without human intervention (and awareness!) in the future.
    To do so, open a PR to set the auto_label attribute in the image configuration. Example
  • You can set a commit prefix, like UPSTREAM: <carry>: . An example.

If you have any questions about this pull request, please reach out to @release-artists in the #forum-ocp-art coreos slack channel.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@patrickdillon
Copy link
Contributor

/hold cancel

@openshift-ci openshift-ci bot removed the do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. label Jan 23, 2025
@openshift-ci-robot
Copy link
Contributor

/retest-required

Remaining retests: 0 against base HEAD c53d688 and 2 for PR HEAD 422d14a in total

@patrickdillon
Copy link
Contributor

/override ci/prow/e2e-azure-ovn-upi

Copy link
Contributor

openshift-ci bot commented Jan 23, 2025

@patrickdillon: Overrode contexts on behalf of patrickdillon: ci/prow/e2e-azure-ovn-upi

In response to this:

/override ci/prow/e2e-azure-ovn-upi

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the kubernetes-sigs/prow repository.

@patrickdillon patrickdillon merged commit d1b3cfe into openshift:main Jan 23, 2025
35 of 40 checks passed
@openshift-ci-robot
Copy link
Contributor

@openshift-bot: Jira Issue OCPBUGS-45551: All pull requests linked via external trackers have merged:

Jira Issue OCPBUGS-45551 has been moved to the MODIFIED state.

In response to this:

Updating ose-installer-altinfra-container image to be consistent with ART for 4.19
TLDR:
Product builds by ART can be configured for different base and builder images than corresponding CI
builds. This automated PR requests a change to CI configuration to align with ART's configuration;
please take steps to merge it quickly or contact ART to coordinate changes.

The configuration in the following ART component metadata is driving this alignment request:
ose-installer-altinfra.yml.

Detail:

This repository is out of sync with the downstream product builds for this component. The CI
configuration for at least one image differs from ART's expected product configuration. This should
be addressed to ensure that the component's CI testing accurate reflects what customers will
experience.

Most of these PRs are opened as an ART-driven proposal to migrate base image or builder(s) to a
different version, usually prior to GA. The intent is to effect changes in both configurations
simultaneously without breaking either CI or ART builds, so usually ART builds are configured to
consider CI as canonical and attempt to match CI config until the PR merges to align both. ART may
also configure changes in GA releases with CI remaining canonical for a brief grace period to enable
CI to succeed and the alignment PR to merge. In either case, ART configuration will be made
canonical at some point (typically at branch-cut before GA or release dev-cut after GA), so it is
important to align CI configuration as soon as possible.

PRs are also triggered when CI configuration changes without ART coordination, for instance to
change the number of builder images or to use a different golang version. These changes should be
coordinated with ART; whether ART configuration is canonical or not, preferably it would be updated
first to enable the changes to occur simultaneously in both CI and ART at the same time. This also
gives ART a chance to validate the intended changes first. For instance, ART compiles most
components with the Golang version being used by the control plane for a given OpenShift release.
Exceptions to this convention (i.e. you believe your component must be compiled with a Golang
version independent from the control plane) must be granted by the OpenShift staff engineers and
communicated to the ART team.

Roles & Responsibilities:

  • Component owners are responsible for ensuring these alignment PRs merge with passing
    tests OR that necessary metadata changes are reported to the ART team: @release-artists
    in #forum-ocp-art on Slack. If necessary, the changes required by this pull request can be
    introduced with a separate PR opened by the component team. Once the repository is aligned,
    this PR will be closed automatically.
  • In particular, it could be that a job like verify-deps is complaining. In that case, please open
    a new PR with the dependency issues addressed (and base images bumped). ART-9595 for reference.
  • Patch-manager or those with sufficient privileges within this repository may add
    any required labels to ensure the PR merges once tests are passing. In cases where ART config is
    canonical, downstream builds are already being built with these changes, and merging this PR
    only improves the fidelity of our CI. In cases where ART config is not canonical, this provides
    a grace period for the component team to align their CI with ART's configuration before it becomes
    canonical in product builds.

ART has been configured to reconcile your CI build root image (see https://docs.ci.openshift.org/docs/architecture/ci-operator/#build-root-image).
In order for your upstream .ci-operator.yaml configuration to be honored, you must set the following in your openshift/release ci-operator configuration file:

build_root:
 from_repository: true

Change behavior of future PRs:

  • In case you just want to follow the base images that ART suggests, you can configure additional labels to be
    set up automatically. This means that such a PR would merge without human intervention (and awareness!) in the future.
    To do so, open a PR to set the auto_label attribute in the image configuration. Example
  • You can set a commit prefix, like UPSTREAM: <carry>: . An example.

If you have any questions about this pull request, please reach out to @release-artists in the #forum-ocp-art coreos slack channel.

Instructions for interacting with me using PR comments are available here. If you have questions or suggestions related to my behavior, please file an issue against the openshift-eng/jira-lifecycle-plugin repository.

@openshift-bot
Copy link
Contributor Author

[ART PR BUILD NOTIFIER]

Distgit: ose-installer-altinfra
This PR has been included in build ose-installer-altinfra-container-v4.19.0-202501232207.p0.gd1b3cfe.assembly.stream.el9.
All builds following this will include this PR.

@openshift-bot
Copy link
Contributor Author

[ART PR BUILD NOTIFIER]

Distgit: ose-baremetal-installer
This PR has been included in build ose-baremetal-installer-container-v4.19.0-202501232207.p0.gd1b3cfe.assembly.stream.el9.
All builds following this will include this PR.

@openshift-bot
Copy link
Contributor Author

[ART PR BUILD NOTIFIER]

Distgit: ose-installer-terraform-providers
This PR has been included in build ose-installer-terraform-providers-container-v4.19.0-202501232207.p0.gd1b3cfe.assembly.stream.el9.
All builds following this will include this PR.

@openshift-bot
Copy link
Contributor Author

[ART PR BUILD NOTIFIER]

Distgit: ose-installer-artifacts
This PR has been included in build ose-installer-artifacts-container-v4.19.0-202501232207.p0.gd1b3cfe.assembly.stream.el9.
All builds following this will include this PR.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
acknowledge-critical-fixes-only Indicates if the issuer of the label is OK with the policy. approved Indicates a PR has been approved by an approver from all required OWNERS files. backport-risk-assessed Indicates a PR to a release branch has been evaluated and considered safe to accept. bugzilla/valid-bug Indicates that a referenced Bugzilla bug is valid for the branch this PR is targeting. cherry-pick-approved Indicates a cherry-pick PR into a release branch has been approved by the release branch manager. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
Projects
None yet
Development

Successfully merging this pull request may close these issues.

5 participants