Skip to content
New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Use frozen branch for rhel7 downstream testing #1263

Merged
merged 6 commits into from
Jul 12, 2024
Merged

Conversation

dupliaka
Copy link
Contributor

After discussion "RHEL Upgrades CI: maintenance time" we decide to use separate branch for rhel7 testing

After discussion "RHEL Upgrades CI: maintenance time" we decide to use separate branch for rhel7 testing
Copy link

Thank you for contributing to the Leapp project!

Please note that every PR needs to comply with the Leapp Guidelines and must pass all tests in order to be mergeable.
If you want to request a review or rebuild a package in copr, you can use following commands as a comment:

  • review please @oamg/developers to notify leapp developers of the review request
  • /packit copr-build to submit a public copr build using packit

Packit will automatically schedule regression tests for this PR's build and latest upstream leapp build.
However, here are additional useful commands for packit:

  • /packit test to re-run manually the default tests
  • /packit retest-failed to re-run failed tests manually
  • /packit test oamg/leapp#42 to run tests with leapp builds for the leapp PR#42 (default is latest upstream - master - build)

Note that first time contributors cannot run tests automatically - they need to be started by a reviewer.

It is possible to schedule specific on-demand tests as well. Currently 2 test sets are supported, beaker-minimal and kernel-rt, both can be used to be run on all upgrade paths or just a couple of specific ones.
To launch on-demand tests with packit:

  • /packit test --labels kernel-rt to schedule kernel-rt tests set for all upgrade paths
  • /packit test --labels beaker-minimal-8.10to9.4,kernel-rt-8.10to9.4 to schedule kernel-rt and beaker-minimal test sets for 8.10->9.4 upgrade path

See other labels for particular jobs defined in the .packit.yaml file.

Please open ticket in case you experience technical problem with the CI. (RH internal only)

Note: In case there are problems with tests not being triggered automatically on new PR/commit or pending for a long time, please contact leapp-infra.

@pirat89 pirat89 added the changelog-checked The merger/reviewer checked the changelog draft document and updated it when relevant label Jul 12, 2024
@pirat89 pirat89 merged commit 9ec9280 into master Jul 12, 2024
17 checks passed
@pirat89 pirat89 deleted the RHELMISC-5949 branch July 12, 2024 14:44
yuravk pushed a commit to yuravk/leapp-repository that referenced this pull request Aug 19, 2024
RHEL 7 is EOM and based on that another testing of IPU 7 -> 8 is used only to be able to discover a possible regression. As such, all integration tests for IPU 7 -> 8 should be executed from a frozen rhel7 branch. Updating packig configuration to address that.

(cherry picked from commit 9ec9280)
yuravk pushed a commit to yuravk/leapp-repository that referenced this pull request Aug 20, 2024
RHEL 7 is EOM and based on that another testing of IPU 7 -> 8 is used only to be able to discover a possible regression. As such, all integration tests for IPU 7 -> 8 should be executed from a frozen rhel7 branch. Updating packig configuration to address that.

(cherry picked from commit 9ec9280)
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment
Labels
changelog-checked The merger/reviewer checked the changelog draft document and updated it when relevant
Projects
None yet
Development

Successfully merging this pull request may close these issues.

2 participants