Skip to content

catchability with power needs correction #260

@Rick-Methot-NOAA

Description

@Rick-Methot-NOAA

Current text:
image

Should be:
3 = Q with power, 2 parameters establish non-linear survey-abundance linkage. y = q * x ^(1 + c). Therefore, c > 0 leads to hyper-stability and c < 0 leads to hyper-depletion.

then
If survey units equal 35 or 36 (e.g. index of a deviation), then Q option 5 or 6 will add the value in the 2nd Q parameter to the expected value. If Q option is 6, then the third parameter is used as a power just as in Q option 3.

Metadata

Metadata

Assignees

Labels

No labels
No labels

Type

No type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions