Skip to content

chore: Merge main into boojum #697

chore: Merge main into boojum

chore: Merge main into boojum #697

Re-run triggered October 18, 2023 18:26
Status Failure
Total duration 6h 2m 0s
Artifacts

ci.yml

on: pull_request
Get changed files
19s
Get changed files
Matrix: Build core images / Build and Push Docker Images
Matrix: Build prover images / Build and Push Docker Images
CI for Core Components  /  ...  /  code_lint
3m 44s
CI for Core Components / lint / code_lint
CI for Core Components  /  unit-tests
8m 30s
CI for Core Components / unit-tests
CI for Core Components  /  loadtest
16m 48s
CI for Core Components / loadtest
CI for Core Components  /  integration
14m 20s
CI for Core Components / integration
CI for Core Components  /  external-node
6h 0m
CI for Core Components / external-node
CI for Prover Components  /  lint
4m 34s
CI for Prover Components / lint
CI for Prover Components  /  unit-tests
11m 3s
CI for Prover Components / unit-tests
CI for Docs  /  lint
2m 26s
CI for Docs / lint
CI for Core lint Components  /  code_lint
CI for Core lint Components / code_lint
Github Status Check
1s
Github Status Check
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 4 warnings
CI for Docs / lint
Process completed with exit code 1.
CI for Core Components / lint / code_lint
Process completed with exit code 1.
Build core images / Build and Push Docker Images (contract-verifier)
unable to access 'https://github.com/matter-labs/era-contracts.git/': Failed to connect to github.com port 443: Connection timed out
Build core images / Build and Push Docker Images (contract-verifier)
clone of 'https://github.com/matter-labs/era-contracts.git' into submodule path '/home/runner/_work/zksync-era/zksync-era/contracts' failed
CI for Core Components / external-node
The job running on runner matterlabs-ci-runner-7tvr4-runner-g94mj has exceeded the maximum execution time of 360 minutes.
CI for Core Components / external-node
The operation was canceled.
CI for Core Components / external-node
Process completed with exit code 1.
Github Status Check
Process completed with exit code 1.
CI for Prover Components / unit-tests
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/ac593985615ec2ede58e132d2e21d2b1cbd6127c'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
CI for Prover Components / unit-tests
Back off 25.518 seconds before retry.
Build core images / Build and Push Docker Images (server-v2)
Failed to download action 'https://api.github.com/repos/actions/checkout/tarball/ac593985615ec2ede58e132d2e21d2b1cbd6127c'. Error: The request was canceled due to the configured HttpClient.Timeout of 100 seconds elapsing.
Build core images / Build and Push Docker Images (server-v2)
Back off 24.606 seconds before retry.