Merge pull request #842 from mainmatter/use-volta-for-release #2135
ci.yml
on: push
Lint Addon
10s
Lint Test App
11s
Tests (Floating Dependencies)
13s
Matrix: allow-fail-try-scenarios
Matrix: Tests
Annotations
17 errors
ember-beta - Allowed to fail
The operation was canceled.
|
Tests (embroider-safe, false)
The operation was canceled.
|
Tests (ember-default, false)
The operation was canceled.
|
Tests (Floating Dependencies)
The operation was canceled.
|
Lint Addon
The operation was canceled.
|
Lint Test App
The operation was canceled.
|
Tests (ember-4.12, false)
The operation was canceled.
|
Tests (ember-4.0, false)
The operation was canceled.
|
embroider-optimized - Allowed to fail
The operation was canceled.
|
Tests (ember-release, false)
Canceling since a higher priority waiting request for 'ci-refs/heads/master' exists
|
Tests (ember-release, false)
The operation was canceled.
|
ember-canary - Allowed to fail
Canceling since a higher priority waiting request for 'ci-refs/heads/master' exists
|
ember-canary - Allowed to fail
The operation was canceled.
|
Tests (ember-lts-4.8, false)
Canceling since a higher priority waiting request for 'ci-refs/heads/master' exists
|
Tests (ember-lts-4.8, false)
The operation was canceled.
|
Tests (ember-lts-4.4, false)
Canceling since a higher priority waiting request for 'ci-refs/heads/master' exists
|
Tests (ember-lts-4.4, false)
The operation was canceled.
|