-
-
Notifications
You must be signed in to change notification settings - Fork 9
Closed
Labels
Description
Blocked by
- Pre-release activities #240
- update vignettes #251 @chlebowa
- [CRAN Release]: v0.5.0 teal.code#188
get_code_dependency()does not cover case where a variable is passed toassignfunction #238- [Bug]: get_code doesn't return dependencies of the lines with # @linksto #261
- [Bug]: assign detection failed for
get_code()#271 - remove backticks around CDISC and ADaM #257 (not a blocker, but nice to merge if we have decision)
- [Bug]: The verification status of the
teal_dataobject is lost making all data to be unverified teal#1069 (Let's squeeze in this fix while addressing the CRAN comments)
Pre-release
- Make sure that high priority bugs (label "priority" + "bug") have been resolved before going into the release.
- Review old/hanging PRs before going into the release.
- Revisit R-package's lifecycle badges (Optional).
- Release Manager: Discuss package dependencies, create a plan to sequentially close release activities and submit groups of packages for internal validation (Applicable only for regulatory release).
- Check Validation Pipeline dry-run results for the package.
- Make sure all relevant integration tests are green 2-3 days before the release. Look carefully through logs (check for warnings and notes).
- Inform about the soft code freeze, decide what gets merged in before starting release activities.
Release
Prepare the release
- Create a new release candidate branch
git checkout -b release-candidate-vX.Y.Z - Update NEWS.md file: make sure it reflects a holistic summary of what has changed in the package, check README.
- Update README:
- include CRAN download links. See teal.code for example.
- Update installation instruction to install from CRAN. See teal.code for example.
- Remove the additional fields (
Remotes) from the DESCRIPTION file where applicable. - Make sure that the minimum dependency versions are updated in the DESCRIPTION file for the package.
- Increase versioned dependency on {package name} to >=X.Y.Z.
- Commit your changes and create the PR on GitHub (add "[skip vbump]" in the PR title). Add all updates, commit, and push changes:
# Make the necessary modifications to your files
# Stage the changes
git add <files your modified>
# Commit the changes
git commit -m "[skip vbump] <Your commit message>"
git push origin release-candidate-vX.Y.Z
Test the release
- Execute the manual tests on Shiny apps that are deployed on various hosting providers (Posit connect and shinyapps.io) - track the results in GitHub issue (Applicable only for frameworks that use Shiny).
- Monitor integration tests, if integration fails, create priority issues on the board.
- Execute UAT tests (Optional).
CRAN submission
- Tag the update(s) as a release candidate vX.Y.Z-rc (e.g. v0.5.3-rc1) on the release candidate branch (release-candidate-vX.Y.Z).
# Create rc tag for submission for internal validation git tag vX.Y.Z-rc<iteration number> git push origin vX.Y.Z-rc<iteration number> - Build the package locally using the command:
R CMD build .which will generate a .tar.gz file necessary for the CRAN submission. - Submit the package to https://win-builder.r-project.org/upload.aspx for testing, for more details please see "Building and checking R source packages for Windows": https://win-builder.r-project.org/.
- Once tested, send the package that was built in the previous steps to CRAN via this form: https://cran.r-project.org/submit.html.
- Address CRAN feedback, tag the package vX.Y.Z-rc(n+1) and repeat the submission to CRAN whenever necessary.
- Get the package accepted and published on CRAN.
Tag the release
- If the additional fields were removed, add them back in a separate PR, and then merge the PR back to main (add "[skip vbump]" in the PR title). If nothing was removed just merge the PR you created in the "Prepare the release" section to
main. Note the commit hash of the merged commit. Note: additional commits might be added to themainbranch by a bot or an automation - we do NOT want to tag this commit.
Make sure of the following before continuing with the release:
- CI checks are passing in GH.
- Shiny apps are deployable and there are no errors/warnings (Applicable only for frameworks that use Shiny).
- Create a git tag with the final version set to vX.Y.Z on the main branch. In order to do this:
- Checkout the commit hash.
git checkout <commit hash> - Tag the hash with the release version (vX.Y.Z).
git tag vX.Y.Z - Push the tag to make the final release.
git push origin vX.Y.Z
- Checkout the commit hash.
- Update downstream package dependencies to (>=X.Y.Z) in {package name}.
Note: Once the release tag is created, the package is automatically published to internal repositories.
Post-release
- Make sure that the package is published to internal repositories (Validated and/or Non-Validated repository).
- Review and update installation instructions for the package if needed.
- Make sure internal documentation/documentation catalogs are up to date.
- Notify the IDR team to start post-release/clean-up activities.
- Announce the release on 31 JAN 2024.
Decision tree
Click here to see the release decision tree.