Skip to content

Make cabal's cabal file compliant with cabal v3#11524

Merged
mergify[bot] merged 2 commits intohaskell:masterfrom
jappeace:make-cabal-v3-compat
Feb 28, 2026
Merged

Make cabal's cabal file compliant with cabal v3#11524
mergify[bot] merged 2 commits intohaskell:masterfrom
jappeace:make-cabal-v3-compat

Conversation

@jappeace
Copy link
Collaborator

The dot newline is no longer supported since v3.
User is supposed to cleanup.
Addresses for cabal at least #11518

The dot newline is no longer supported since v3.
User is supposed to cleanup.
this is the place where space is not!
@geekosaur
Copy link
Collaborator

Are we ok to merge, @jappeace?

@jappeace
Copy link
Collaborator Author

yeah, I was just wondering how to do that

@geekosaur geekosaur added the merge me Tell Mergify Bot to merge label Feb 26, 2026
@mergify mergify bot added the ready and waiting Mergify is waiting out the cooldown period label Feb 26, 2026
@geekosaur
Copy link
Collaborator

Done. Barring complaints during the cooldown period, it'll go in in 2 days.

@mergify mergify bot added merge delay passed Applied (usually by Mergify) when PR approved and received no updates for 2 days queued labels Feb 28, 2026
@mergify
Copy link
Contributor

mergify bot commented Feb 28, 2026

Merge Queue Status

Rule: default


This pull request spent 1 hour 57 minutes 6 seconds in the queue, including 1 hour 46 minutes 23 seconds running CI.

Required conditions to merge
  • #approved-reviews-by >= 2 [🛡 GitHub branch protection]
  • #changes-requested-reviews-by = 0 [🛡 GitHub branch protection]
  • #review-threads-unresolved = 0 [🛡 GitHub branch protection]
  • any of [🛡 GitHub branch protection]:
    • check-success = Doctest Cabal
    • check-neutral = Doctest Cabal
    • check-skipped = Doctest Cabal
  • any of [🛡 GitHub branch protection]:
    • check-success = Meta checks
    • check-neutral = Meta checks
    • check-skipped = Meta checks
  • any of [🛡 GitHub branch protection]:
    • check-success = docs/readthedocs.org:cabal
    • check-neutral = docs/readthedocs.org:cabal
    • check-skipped = docs/readthedocs.org:cabal
  • any of [🛡 GitHub branch protection]:
    • check-success = Validate post job
    • check-neutral = Validate post job
    • check-skipped = Validate post job
  • any of [🛡 GitHub branch protection]:
    • check-success = fourmolu
    • check-neutral = fourmolu
    • check-skipped = fourmolu
  • any of [🛡 GitHub branch protection]:
    • check-success = hlint
    • check-neutral = hlint
    • check-skipped = hlint
  • any of [🛡 GitHub branch protection]:
    • check-success = Bootstrap post job
    • check-neutral = Bootstrap post job
    • check-skipped = Bootstrap post job
  • any of [🛡 GitHub branch protection]:
    • check-success = whitespace
    • check-neutral = whitespace
    • check-skipped = whitespace
  • any of [🛡 GitHub branch protection]:
    • check-success = Check sdist post job
    • check-neutral = Check sdist post job
    • check-skipped = Check sdist post job
  • any of [🛡 GitHub branch protection]:
    • check-success = Changelogs
    • check-neutral = Changelogs
    • check-skipped = Changelogs

mergify bot added a commit that referenced this pull request Feb 28, 2026
@mergify mergify bot merged commit 3fafd1e into haskell:master Feb 28, 2026
344 of 349 checks passed
@mergify mergify bot removed the queued label Feb 28, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

merge delay passed Applied (usually by Mergify) when PR approved and received no updates for 2 days merge me Tell Mergify Bot to merge ready and waiting Mergify is waiting out the cooldown period

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants