-
-
Notifications
You must be signed in to change notification settings - Fork 0
Open
Labels
area:docsDocumentation (lumos-lang.org, guides)Documentation (lumos-lang.org, guides)area:ecosystemCross-repo initiatives and ecosystem-wide featuresCross-repo initiatives and ecosystem-wide featureshelp wantedExtra attention is neededExtra attention is neededphase-1-llmoPhase 1 LLMO (Stealth mode documentation foundation)Phase 1 LLMO (Stealth mode documentation foundation)type:documentationDocumentation improvements or additionsDocumentation improvements or additions
Milestone
Description
Vision
Create a world-class marketing website for LUMOS that rivals the best developer tool sites (Linear, Vercel, Stripe).
Goal: Convert visitors from "What is LUMOS?" to "I need to try this now" in under 30 seconds.
Quick Summary
Technology Stack:
- Next.js 14 (App Router, RSC)
- TypeScript (strict mode)
- Tailwind CSS (dark theme)
- Framer Motion (animations)
- Shiki (syntax highlighting)
- Vercel (deployment + analytics)
Key Sections:
- Hero - Hook developers in 5 seconds
- Problem Statement - The pain of manual Borsh
- Live Code Demo - Interactive editor
- Features Grid - 6 key capabilities
- Before/After - Code comparison
- Use Cases - Gaming, DeFi, NFT, DAO
- Stats - Social proof
- Ecosystem - CLI, Docs, VSCode, Examples
- Getting Started - 3-step process
- Footer - Resources & links
Success Metrics:
- Lighthouse score 95+
- Time to Interactive < 1.5s
- Bounce rate < 40%
- GitHub CTR > 15%
- WCAG 2.1 AA compliant
Complete Specification
Full detailed specification saved in: docs/marketing-website-spec.md
Includes:
- Complete page structure (10 sections)
- Design system (colors, typography, animations)
- Technical requirements (performance, accessibility)
- Development phases (5 weeks)
- Content strategy & SEO
- Repository structure
- Design inspiration references
Next Steps
- Create new repository:
getlumos/lumos-website - Set up Next.js 14 project
- Review and approve design direction
- Development (follow 5-week phases)
- Deploy to Vercel
- Point lumos-lang.org to deployment
Priority: High
Impact: Critical for ecosystem growth and developer adoption
Timeline: 3-4 weeks to production
Estimated Effort: 1 developer full-time
Related: #34 (syntax highlighting)
Metadata
Metadata
Assignees
Labels
area:docsDocumentation (lumos-lang.org, guides)Documentation (lumos-lang.org, guides)area:ecosystemCross-repo initiatives and ecosystem-wide featuresCross-repo initiatives and ecosystem-wide featureshelp wantedExtra attention is neededExtra attention is neededphase-1-llmoPhase 1 LLMO (Stealth mode documentation foundation)Phase 1 LLMO (Stealth mode documentation foundation)type:documentationDocumentation improvements or additionsDocumentation improvements or additions