Closed
Description
The following task list outlines the milestones required to complete the passive F3 testing on mainnet.
See F3 Mainnet Passive Test Plan for more details.
- Testing utilities for passive testing in network deployment #229
- Comprehensive Simulation Testing #226
- Monitoring Infrastructure Setup #227
- Local Testnet Deployment #228
- Calibnet Deployment: Deploy the F3 protocol on Calibnet to mimic the conditions and processes of a mainnet rollout.
- Post-Calibnet Deployment Metrics Analysis: Analyze the collected metrics for performance and correctness indicators. Confirm that all systems function as expected based on the metrics.
- Potential Pre-mainnet F3 Implementation Adjustments: Based on insights from the Calibnet deployment, make any necessary adjustments. Freeze the F3 Alpha implementation in preparation for mainnet deployment.
- Mainnet Deployment: Roll out the optimized F3 implementation across the mainnet. Follow a phased approach to monitor performance and impact during the rollout.
- Post-Mainnet Deployment Metrics Analysis: Continuously monitor the F3 metrics post-mainnet deployment. Assess performance, correctness, and uptake to determine if further adjustments are needed.
Metadata
Metadata
Assignees
Type
Projects
Status
Done