Skip to content

Conversation

@igoristic
Copy link
Contributor

Backports the following commits to 7.x:

* Disk usage alert draft

* Fixed typings and defaults

* Fixed tests

* Fixed tests

* Addressed code feedback

* Fixed disk and cpu usage states

* Fixed resolve state and throttle

* CR feedback

* Fixed links
@igoristic igoristic added the backport This PR is a backport of another PR label Sep 30, 2020
@kibanamachine
Copy link
Contributor

💚 Build Succeeded

Metrics [docs]

@kbn/optimizer bundle module count

id value diff baseline
monitoring 628 +4 624

async chunks size

id value diff baseline
monitoring 1.2MB +137.0B 1.2MB

distributable file count

id value diff baseline
default 47554 +3 47551

page load bundle size

id value diff baseline
monitoring 183.5KB +22.7KB 160.8KB

To update your PR or re-run it, just comment with:
@elasticmachine merge upstream

@igoristic igoristic merged commit 8c21858 into elastic:7.x Sep 30, 2020
@igoristic igoristic deleted the backport/7.x/pr-75419 branch September 30, 2020 18:22
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport This PR is a backport of another PR

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants