Skip to content

Releases: efantnu/hybrid-ess-design

As Published Release

28 May 07:31
2473712
Compare
Choose a tag to compare

Release after publication in Frontiers in Energy Research: https://www.frontiersin.org/articles/10.3389/fenrg.2021.649200/full

This version corrects a bug in energy_storage_pre.m and energy_storage.slx that multiplied the inertia constant of the synchronous machine by 4.

If you have cloned or forked the repository earlier, please update these two files or divide the parameter gt1.SM.M in energy_storage_pre.m by 4 to obtain correct results.

The result files were also updated.

Review 1 release

12 Mar 12:54
Compare
Choose a tag to compare

Release after the first review round with Frontiers in Energy Research.

Now there are 4 simulation cases for the sizing validation:

  • Case 1: 3 MW load step without ESS
  • Case 2: 3 MW load step with ESS
  • Case 3: 12 MW wind farm disconnection without ESS
  • Case 4: 12 MW wind farm disconnection with ESS

Initial release

22 Dec 13:46
fa376bb
Compare
Choose a tag to compare

Initial release before submission to Frontiers in Energy Research.