Skip to content

Conversation

@iluise
Copy link
Collaborator

@iluise iluise commented Jan 21, 2026

Description

Modify ratio plots and run plots to work with just 1 run_id.
In that case the baseline is a set of ones and the description of the plot is changed to just plot the mean scores as a function of the variable.
Useful for the latent_space analysis.

To be merged after: #1670

Issue Number

Closes #1671

Is this PR a draft? Mark it as draft.

Checklist before asking for review

  • I have performed a self-review of my code
  • My changes comply with basic sanity checks:
    • I have fixed formatting issues with ./scripts/actions.sh lint
    • I have run unit tests with ./scripts/actions.sh unit-test
    • I have documented my code and I have updated the docstrings.
    • I have added unit tests, if relevant
  • I have tried my changes with data and code:
    • I have run the integration tests with ./scripts/actions.sh integration-test
    • (bigger changes) I have run a full training and I have written in the comment the run_id(s): launch-slurm.py --time 60
    • (bigger changes and experiments) I have shared a hegdedoc in the github issue with all the configurations and runs for this experiments
  • I have informed and aligned with people impacted by my change:
    • for config changes: the MatterMost channels and/or a design doc
    • for changes of dependencies: the MatterMost software development channel

@iluise iluise requested a review from SavvasMel January 21, 2026 18:22
@iluise iluise self-assigned this Jan 21, 2026
@iluise iluise added the eval anything related to the model evaluation pipeline label Jan 21, 2026
@github-actions github-actions bot added the eval anything related to the model evaluation pipeline label Jan 21, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

eval anything related to the model evaluation pipeline

Projects

Status: No status

Development

Successfully merging this pull request may close these issues.

evaluation pipeline make ratio_plots and bar plots work with 1 run

2 participants