Skip to content

Conversation

@PiotrKorkus
Copy link
Contributor

  • add proper logging configuration
  • highest verbosity in CICD

Bugfix

Important

Use this template only for bugfixes that do not influence topics covered by contribution requests or improvements.

Caution

Make sure to submit your pull-request as Draft until you are ready to have it reviewed by the Committers.

Description

[A short description of the bug being fixed by the contribution.]

Related ticket

Important

Please replace [ISSUE-NUMBER] with the issue-number that tracks this bug fix. If there is no such
ticket yet, create one via this issue template.

closes [ISSUE-NUMBER] (bugfix ticket)

@PiotrKorkus PiotrKorkus requested a review from Saumya-R January 19, 2026 17:55
@github-actions
Copy link

github-actions bot commented Jan 19, 2026

License Check Results

🚀 The license check job ran with the Bazel command:

bazel run //:license-check

Status: ⚠️ Needs Review

Click to expand output
[License Check Output]
Extracting Bazel installation...
Starting local Bazel server (8.3.0) and connecting to it...
INFO: Invocation ID: 7ec1fb7c-cbbd-4ba4-a56a-33d2e84c877f
Computing main repo mapping: 
Computing main repo mapping: 
Computing main repo mapping: 
WARNING: For repository 'score_bazel_platforms', the root module requires module version score_bazel_platforms@0.0.2, but got score_bazel_platforms@0.0.3 in the resolved dependency graph. Please update the version in your MODULE.bazel or set --check_direct_dependencies=off
WARNING: For repository 'score_process', the root module requires module version score_process@1.3.2, but got score_process@1.4.0 in the resolved dependency graph. Please update the version in your MODULE.bazel or set --check_direct_dependencies=off
Computing main repo mapping: 
Loading: 
Loading: 3 packages loaded
Loading: 3 packages loaded
    currently loading: 
Analyzing: target //:license-check (4 packages loaded, 0 targets configured)
Analyzing: target //:license-check (4 packages loaded, 0 targets configured)

Analyzing: target //:license-check (81 packages loaded, 10 targets configured)

Analyzing: target //:license-check (146 packages loaded, 1417 targets configured)

Analyzing: target //:license-check (147 packages loaded, 6741 targets configured)

Analyzing: target //:license-check (155 packages loaded, 6822 targets configured)

Analyzing: target //:license-check (155 packages loaded, 6832 targets configured)

Analyzing: target //:license-check (156 packages loaded, 6832 targets configured)

Analyzing: target //:license-check (158 packages loaded, 8842 targets configured)

INFO: Analyzed target //:license-check (160 packages loaded, 9092 targets configured).
[7 / 14] Creating runfiles tree bazel-out/k8-opt-exec-ST-d57f47055a04/bin/external/score_tooling+/dash/tool/formatters/dash_format_converter.runfiles [for tool]; 0s local
INFO: From Generating Dash formatted dependency file ...:
INFO: Successfully converted 62 packages from Cargo.lock to bazel-out/k8-fastbuild/bin/formatted.txt
[11 / 14] JavaToolchainCompileClasses external/rules_java+/toolchains/platformclasspath_classes; 0s disk-cache, processwrapper-sandbox
[12 / 14] JavaToolchainCompileBootClasspath external/rules_java+/toolchains/platformclasspath.jar; 0s disk-cache, processwrapper-sandbox
INFO: Found 1 target...
Target //:license.check.license_check up-to-date:
  bazel-bin/license.check.license_check
  bazel-bin/license.check.license_check.jar
INFO: Elapsed time: 19.569s, Critical Path: 2.53s
INFO: 14 processes: 9 internal, 4 processwrapper-sandbox, 1 worker.
INFO: Build completed successfully, 14 total actions
INFO: Running command line: bazel-bin/license.check.license_check ./formatted.txt <args omitted>
usage: org.eclipse.dash.licenses.cli.Main [-batch <int>] [-cd <url>]
       [-confidence <int>] [-ef <url>] [-excludeSources <sources>] [-help] [-lic
       <url>] [-project <shortname>] [-repo <url>] [-review] [-summary <file>]
       [-timeout <seconds>] [-token <token>]

@github-actions
Copy link

The created documentation from the pull request is available at: docu-html

@Saumya-R
Copy link
Contributor

What is the [ISSUE-NUMBER] (bugfix ticket) we are fixing here ?

vinodreddy-g
vinodreddy-g previously approved these changes Jan 29, 2026
@vinodreddy-g vinodreddy-g self-requested a review January 29, 2026 13:03
@vinodreddy-g
Copy link
Contributor

@PiotrKorkus could you fix the merge conflicts.

- add proper logging configuration
- highest verbosity in CICD
@PiotrKorkus PiotrKorkus force-pushed the piotrkorkus_test_logging branch from 2645515 to 5ccfb13 Compare February 2, 2026 08:26
@vinodreddy-g vinodreddy-g merged commit bfa2356 into eclipse-score:main Feb 3, 2026
17 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

3 participants