Open
Description
(Some notes)
- Knowing the elevation of the crown of the road at the crossing, project that elevation upstream and create the lake/bathtub/reservoir--the area that would fill before it would spill over the roadway.
- Figure out the volume of that area--the upstream max storage volume.
- Compare that volume to capacity, and determine if that volume would translate to a rate that would exceed the capacity (which is also a rate)
More to come.