Skip to content

Merge pull request #85 from beeware/dependabot/github_actions/actions… #244

Merge pull request #85 from beeware/dependabot/github_actions/actions…

Merge pull request #85 from beeware/dependabot/github_actions/actions… #244

Triggered via push July 14, 2024 23:29
Status Failure
Total duration 6h 11m 49s
Artifacts

ci.yml

on: push
Pre-commit checks  /  Pre-commit Checks
15s
Pre-commit checks / Pre-commit Checks
Matrix: Unit tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Unit tests (iOS, 3.8)
[notice] A new release of pip is available: 21.1.1 -> 24.1.2 [notice] To update, run: python3.8 -m pip install --upgrade pip
Unit tests (macOS-app, 3.8)
[notice] A new release of pip is available: 21.1.1 -> 24.1.2 [notice] To update, run: python3.8 -m pip install --upgrade pip
Unit tests (macOS-Xcode, 3.8)
[notice] A new release of pip is available: 21.1.1 -> 24.1.2 [notice] To update, run: python3.8 -m pip install --upgrade pip
Unit tests (iOS, 3.9)
The job running on runner GitHub Actions 9 has exceeded the maximum execution time of 360 minutes.
Unit tests (iOS, 3.9)
The operation was canceled.