Part of #550. Closes the epic, #434 and #439.
What
- B_SC re-cast as the gap-cost reduction inside the projection (measured 5.75 s, CI [3.14, 8.25], n=124); POS_GAP_S demoted to legacy-path-only; the VSC bonus stays documented as an unmeasured placeholder.
- The stop-hazard table wired as OVERCUT eligibility on the surfaces whose rivals lack is_pitting (/recommend, MCP), per the capability matrix from the gate-1 audit.
- Every doc page describing the MC updated in this PR (docs are part of the fix): docs site multi-agent + agents-api + arcade pages, the agents README, the submodule design spec. Signature tables regenerated by introspection, never by hand.
- A/B simulation report in the PR body: Lusail 2025 SC laps + a green race + the sweep argmax distribution, before vs after.
Closes #434
Closes #439
Part of #550. Closes the epic, #434 and #439.
What
Closes #434
Closes #439