Skip to content

Revise the BuildingSync upload to ignore meter data and/or allow meters to be ignored from analyses #3802

@anchapin

Description

@anchapin

When performing an analysis such as EUI, all of the meter data for the given period of time is included in the calculation. However, if meter data is included in Audit Template (AT) and imported via BuildingSync or AT API then this data gets assigned to its own meter(s). This means that utility data is double counted in this scenario.

Either give the user an option to exclude certain meters from analyses or the option to exclude meter data from BulidingSync files.

Metadata

Metadata

Assignees

No one assigned

    Type

    No type

    Projects

    Status

    No status

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions