Skip to content

Duration of route #920

@MaartenDeen

Description

@MaartenDeen

Issue 463 was fixed some time ago, but now it is back again, with a vengeance. Route durations are again based on a maximum speed of some 80 km/h, even when driving on the motorway. The routes in my original examples now take even longer.
http://map.project-osrm.org/1rj now takes 40 minutes for 57 km (was 38 minutes) (85,5 km/h on a motorway with maxspeed=130) and http://map.project-osrm.org/1rk now takes 4:06 for 334 km (was 3:55).

Can this be corrected again so that route calculations take the maxspeed from the ways, if available, without an arbitrary maximum?

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions