PRIDE PPP-AR 3.1.1 has been equipped with MHM to mitigate multipath effects. Here we have an example of using several days of 30-s data to model multipath and then mitigating the multipath effects at a 1-Hz station in the 2025 Tingri Mw7.1 event.
Displacements in east, north and up after multipath mitigation:

Displacements in east, north and up before multipath mitigation:
