Skip to content

[BUG] Sprint assigned to incorrect project #2444

Closed
@jeffreydao

Description

@jeffreydao

If you have problems with the installation please use our community forum

What set up are you using

  • Cloud Hosted Version
  • Self Hosted

Describe the bug
When assigning a sprint to a project, the project list is shown twice, and the sprint is not assigned to the selected project

To Reproduce
Steps to reproduce the behavior:

  1. On a fresh install via docker, create an initial project.
  2. Create a second project
  3. Enter either project -> select to-dos to the navigation panel -> select the drop-down next to to-dos //
  4. Create a new sprint, and observe the duplicated list of projects
  5. Select either two bottom projects and the first project will be assigned the sprint irrespective of the project chosen

Visual Walkthrough
Practicum was created as the initial project on startup, then APCD was created second.
Screenshot 2024-03-26 at 9 58 14 AM

When creating a sprint, the projects are listed twice within the drop-down.
Screenshot 2024-03-26 at 9 58 58 AM

Example creating a sprint assigned to the APCD project
Screenshot 2024-03-26 at 9 59 49 AM

Unexpected behavior: it is assigned to the practicum
Screenshot 2024-03-26 at 10 00 46 AM

The assignment of the project for the sprint can be fixed by using the upper list
Screenshot 2024-03-26 at 10 01 13 AM

Leantime Version
Leantime 3.0.7

Mysql Version
Mysql 8.0

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    BugFixed and StagedFixed in Master and ready to be included in the next release

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions