You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
#49 - PRD: Claude Code baseline for the Solo Dev Starter Suite
Current behavior / design
As of this issue being written, #49 is the active Claude Code baseline PRD. It should remain open until readiness, Phase 1 shakedown, Phase 2 repeated evidence collection, and the Claude Code baseline report are complete and linked from the parent issue.
Why change
The parent PRD needs an explicit closeout step so the project does not drift from baseline collection into comparison work without durable artifact links and a clear completed state. Once #49 closes, #50 can become the planning anchor for Codex-vs-Claude comparison.
What to build
Prepare the #49 closeout. Verify that all child issues are complete, final artifacts are merged to origin/main, links are stable after the Markdown report-bundle reorganization, and the final comment summarizes the Claude Code baseline evidence without adding comparison claims.
Post the final closeout comment on #49 and close it as completed only after the artifacts are merged and Jordan approves the closeout.
Acceptance criteria
Readiness/config verification, Phase 1, Phase 2, and report issues are complete or explicitly superseded.
Final Claude Code baseline artifacts are merged to origin/main and linked in the closeout comment.
The closeout comment includes links to the report, selected evidence set, digest, model/config note, and any review packet or caveat summary.
The closeout comment states the selected trial count, task count, model/config, and high-level grader/review result.
Closing this closeout issue after PR #59 merged the approved Claude Code baseline report and the final baseline closeout comment was posted on #49: #49 (comment)
#50 remains open as the next discussion point for Codex-vs-Claude comparison planning.
Parent
#49 - PRD: Claude Code baseline for the Solo Dev Starter Suite
Current behavior / design
As of this issue being written, #49 is the active Claude Code baseline PRD. It should remain open until readiness, Phase 1 shakedown, Phase 2 repeated evidence collection, and the Claude Code baseline report are complete and linked from the parent issue.
Why change
The parent PRD needs an explicit closeout step so the project does not drift from baseline collection into comparison work without durable artifact links and a clear completed state. Once #49 closes, #50 can become the planning anchor for Codex-vs-Claude comparison.
What to build
Prepare the #49 closeout. Verify that all child issues are complete, final artifacts are merged to
origin/main, links are stable after the Markdown report-bundle reorganization, and the final comment summarizes the Claude Code baseline evidence without adding comparison claims.Post the final closeout comment on #49 and close it as completed only after the artifacts are merged and Jordan approves the closeout.
Acceptance criteria
origin/mainand linked in the closeout comment.Blocked by