Skip to content
This repository has been archived by the owner on Apr 19, 2024. It is now read-only.

Clarify concurrency of B tasks #19

Merged
merged 2 commits into from
Jan 21, 2021
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
4 changes: 2 additions & 2 deletions challenge-OT4-B1/readme.md
Original file line number Diff line number Diff line change
Expand Up @@ -5,13 +5,13 @@

## Mission

- Run a node for a month (30 full calender days).
- Run a node for a month (30 full calendar days).

- The 30 days count starts from 21-01-2021 at 08:00 CET, even if you started to run your node before that. Hence, if you have uninterrupted uptime, the challenge can earliest be completed on 20-02-2021 at 08:00 CET.

- If your node is down for some periods, you must add the lost time afterwards. The summary log accumulates the uptimes of the node. It must show a runtime of at least 720 hours when submitting.

- This challenge can be run concurrently with either challenge OT4-B2, OT-B3 or OT4-B4 or as a stand-alone challenge.
- This challenge can be run concurrently with either challenge OT4-B2, OT-B3 or OT4-B4 or as a stand-alone challenge.


## Submission
Expand Down
9 changes: 6 additions & 3 deletions challenge-OT4-B2/readme.md
Original file line number Diff line number Diff line change
@@ -1,13 +1,16 @@
| Challenge | Title | GTU Reward | Seats | Start Date | Last Date for Submission |
| - | - | -:| - |- | - |
| OT4-B2 | Run a baker for a month. | 1000 GTU | 250 | 20-01-2021 23:00 PT | 03-03-2021 23:00 PT |

##

:warning: If you choose to do this challenge, you cannot also do B3 or B4.

## Mission

**1) Setup a node**

- Run a node for a month (30 full calender days).
- Run a node for a month (30 full calendar days).

- The 30 days count starts from 21-01-2021 at 08:00 CET, even if you started to run your node before that. Hence, if you have uninterrupted uptime, the challenge can earliest be completed on 20-02-2021 at 08:00 CET.

Expand All @@ -29,7 +32,7 @@

- Verify that your stake limit cannot be transferred.

- Check your account regularly for baker rewards.
- Check your account regularly for baker rewards.
- Note that with a 2000 GTU stake you might receive one baker reward per week but it is not guaranteed. Don't panic, receiving a baker reward is not mandatory for a successful submission.
- If you have received a baker reward, verify that it is added to the staked amount or to the amount at disposal, depending on the restake earnings status of your baker account.

Expand All @@ -41,7 +44,7 @@
- Add your baker ID
- Add your baker account address
- Add the blockhash of the block with the add baker transaction in it

- Upload your summary log (see [Logs](/logs.md) for instructions & tooling)
- Runtime must show >= 720 hours.
- Do not temper with or change anything in the log. Otherwise, we cannot guarantee acceptance.
Expand Down
7 changes: 4 additions & 3 deletions challenge-OT4-B3/readme.md
Original file line number Diff line number Diff line change
Expand Up @@ -4,12 +4,13 @@

##

:warning: If you choose to do this challenge, you cannot also do B2 or B4.

## Mission

**1) Setup a node**

- Run a node for a month (30 full calender days).
- Run a node for a month (30 full calendar days).

- The 30 days count starts from 21-01-2021 at 08:00 CET, even if you started to run your node before that. Hence, if you have uninterrupted uptime, the challenge can earliest be completed on 20-02-2021 at 08:00 CET.

Expand All @@ -31,7 +32,7 @@

- Verify that your stake limit cannot be transferred.

- Check your account regularly for baker rewards.
- Check your account regularly for baker rewards.
- Note that with a 2000 GTU stake you might receive one baker reward per week but it is not guaranteed. Don't panic, receiving a baker reward is not mandatory for a successful submission.
- If you have received a baker reward, verify that it is added to the staked amount or to the amount at disposal, depending on the restake earnings status of your baker account.

Expand All @@ -45,7 +46,7 @@

- Verify that your stake limit cannot be transferred.

- Check your account regularly for baker rewards.
- Check your account regularly for baker rewards.
- Note that with a 2000 GTU stake you might receive one baker reward per week but it is not guaranteed. Don't panic, receiving a baker reward is not mandatory for a successful submission.
- If you have received a baker reward, verify that it is added to the staked amount or to the amount at disposal, depending on the restake earnings status of your baker account.

Expand Down
3 changes: 2 additions & 1 deletion challenge-OT4-B4/readme.md
Original file line number Diff line number Diff line change
Expand Up @@ -4,12 +4,13 @@

##

:warning: If you choose to do this challenge, you cannot also do B2 or B3.

## Mission

**1) Setup a node**

- Run a node for a month (30 full calender days).
- Run a node for a month (30 full calendar days).

- The 30 days count starts from 21-01-2021 at 08:00 CET, even if you started to run your node before that. Hence, if you have uninterrupted uptime, the challenge can earliest be completed on 20-02-2021 at 08:00 CET.

Expand Down
2 changes: 1 addition & 1 deletion readme.md
Original file line number Diff line number Diff line change
Expand Up @@ -28,7 +28,7 @@ Each challenge has its own subfolder under `challenge-OT4-*` with a `readme.md`
| OT4-B3 | [Register and deregister as baker.](challenge-OT4-B3) | 2000 GTU | 250 | 20-01-2021 23:00 PT | 03-03-2021 23:00 PT |
| OT4-B4 | [Make baker updates.](challenge-OT4-B4) | 3000 GTU | 250 | 20-01-2021 23:00 PT | 03-03-2021 23:00 PT |

Each of the baker challenge OT4-B* takes 4 weeks to complete. OT4-B1 can be run as a stand-alone challenge or concurrently with either challenge OT4-B2, OT-B3, or OT4-B4. OT4-B2, OT4-B3, and OT4-B4 **cannot** be combined with each other.
Each of the baker challenge OT4-B* takes 4 weeks to complete. OT4-B1 can be run as a stand-alone challenge or concurrently with <ins>**one of**</ins> either OT4-B2, OT-B3, or OT4-B4. OT4-B2, OT4-B3, and OT4-B4 **cannot** be combined with each other.

The challenges intentionally only provide a minimum description of the tasks. For detailed step-to-step guides and troubleshooting, we expect contributors to consult [Documentation and Help](#documentation-and-help) or our [Discord channel](https://discord.com/invite/xWmQ5tp).

Expand Down