-
Notifications
You must be signed in to change notification settings - Fork 172
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
- Loading branch information
Showing
4 changed files
with
76 additions
and
39 deletions.
There are no files selected for viewing
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,38 @@ | ||
|
||
**(C) 2016 Jaguar Land Rover - All rights reserved.**<br> | ||
|
||
All documents in this repository are available under the Creative | ||
Commons Attribution 4.0 International (CC BY 4.0). Click | ||
[here](https://creativecommons.org/licenses/by/4.0/) for details. | ||
All code in this repository is available under Mozilla Public License | ||
v2 (MPLv2). Click [here](https://www.mozilla.org/en-US/MPL/2.0/) for | ||
details. | ||
|
||
# RELEASE PROCESS | ||
This document describes the process creating a new version of the | ||
signal specification. | ||
|
||
The process, driven by the GENIVI Remote Vehicle Interaction Expert | ||
Group (RVI EG), is aimed at being lightweight and carried out in public, giving both | ||
GENIVI members and non-members a say in the creation of a new version. | ||
|
||
In git, the ```develop``` branch is used as an integration branch | ||
accepting pull requests with new and modified vpsec files from | ||
contributors. | ||
|
||
Pull requests are reviewed in the public genivi | ||
list ```genivi-projects@lists.genivi.org```. Once the review process | ||
has concluded, the RVI EG decides if the pull request is to be | ||
accepted or not. | ||
|
||
A new signal specification release is created om a quarterly basis at | ||
the following dates: Jan 1, Apr 1, Jul 1, Oct 1. | ||
|
||
If no changes have been agreed upon since the last release of the | ||
specification, the release is skipped and no new version is created. | ||
|
||
A new release is made by merging the develop branch into master, and | ||
then create a master branch tag named after the release | ||
date such as ```rel_2016-04-01```. | ||
|
||
|
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.
Loading
Sorry, something went wrong. Reload?
Sorry, we cannot display this file.
Sorry, this file is invalid so it cannot be displayed.