Skip to content

chore(roadmap): apply Codex prioritization — excise + kill + add demand-signal gate - #349

Merged
BaseInfinity merged 1 commit into
mainfrom
chore/roadmap-prio-cleanup-2026-05-24
May 24, 2026
Merged

chore(roadmap): apply Codex prioritization — excise + kill + add demand-signal gate#349
BaseInfinity merged 1 commit into
mainfrom
chore/roadmap-prio-cleanup-2026-05-24

Conversation

@BaseInfinity

Copy link
Copy Markdown
Owner

Summary

Applies the Codex cross-model prioritization (.reviews/roadmap-prio-codex.md, 2026-05-24) to the ROADMAP. Net: smaller backlog, sibling repos own their work, a gate that stops "NO for now" from accumulating as permanent cognitive debt.

What changed

Why now

Maintainer asked for prioritization. Cross-model review (Codex gpt-5.5 xhigh) flagged that the current backlog accumulates "deferred" items into permanent cognitive load — every session re-litigates the same stale items. Cleaning + adding a gate prevents the next session from doing the same triage work.

What stays open

DO SOON (waiting on trigger): #302, #19
DEFER (named triggers): #71, #83, #222, #347
DO NEXT (after this cleanup): A1 `release-dry-run` CI job, A2 PUBLISH FAILED guard, #89 marketplace first-contact

Test plan

  • `bash tests/test-doc-consistency.sh` green (39/39)
  • Diff is +21 / -8 — surgical edits, original entries preserved in archived `
    Details` blocks
  • CI `validate` green

…l stale items, add demand-signal gate

Applies the Codex prioritization from .reviews/roadmap-prio-codex.md
(2026-05-24).

Excised (tracked in sibling repos):
- #9 OpenCode port → BaseInfinity/opencode-sdlc-wizard
- #82 Domain DLCs → Stefan's separate track
- #91 Multi-Agent Adapter umbrella → per-adapter sibling repos
- Back Burner: Agent-agnostic SDLC → adapter/sibling strategy

Killed (no demand signal + months stale):
- #85 Phase 2 (1.7 mo, killed by #231 zero-cron philosophy)
- #233 automation subitems (1 mo, Max-user footgun, no API-cost user)
- Back Burner: Chaos/Resilience Testing (1.8 mo, no concrete failure)
- Back Burner: Subagent Model Compliance Audit (3+ mo, prototype already deleted)

New: Demand-Signal-First entry gate added at top of ROADMAP. New items
require one of: maintainer pain event with repro, second external user
signal, dated platform deadline, or low-cost cleanup. Everything else
goes to a Research Parking Lot with 30/60-day expiry. Row states:
Actionable now / Waiting on trigger / Tracked elsewhere / DONE / KILLED.

Net: backlog shrinks, sibling repos own their work, and the gate stops
'NO for now' from accumulating as permanent cognitive debt.
@BaseInfinity
BaseInfinity merged commit f58ee43 into main May 24, 2026
3 checks passed
@BaseInfinity
BaseInfinity deleted the chore/roadmap-prio-cleanup-2026-05-24 branch May 24, 2026 19:52
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant