feat: [#31] Add comprehensive deployment stages and workflow documentation
- Document complete two-phase deployment architecture - Phase 1: Build external artifacts (Docker images, golden VM images) - Phase 2: Environment-specific provisioning and deployment - Include detailed stage definitions, workflows, and automation status - Add error handling strategies and rollback procedures - Define performance optimization patterns for development/testing/production - Establish foundation for PoC-to-production redesign implementation Resolves requirements for deployment stage documentation in project redesign.
1 parent da89922 commit 38a54ee

File tree

1 file changed

+306
-0
lines changed

1 file changed

+306
-0
lines changed
Lines changed: 306 additions & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -0,0 +1,306 @@
1+
# Deployment Stages and Workflow
2+
3+
## Overview
4+
5+
This document defines the complete deployment workflow for Torrust Tracker environments,
6+
breaking down the process into discrete stages that can be executed independently or
7+
as part of an automated pipeline.
8+
9+
The workflow separates concerns between external artifact preparation, infrastructure
10+
provisioning, and application deployment to enable efficient iteration and debugging.
11+
12+
## Stage Classification
13+
14+
**Generic Stages**: Execute once and apply to all environments
15+
**Environment-Specific Stages**: Execute per environment with environment-specific configuration
16+
17+
## Complete Deployment Workflow
18+
19+
### Phase 1: Build External Artifacts (Generic)
20+
21+
These stages prepare reusable artifacts that can be deployed to any environment.
22+
23+
#### 1.1 Generate Tracker Docker Image
24+
25+
**Purpose**: Create the application container image using twelve-factor build principles.
26+
27+
**Execution Method**: Automated via CI/CD pipeline
28+
29+
**Trigger**: New tag creation in the Torrust Tracker repository
30+
31+
**Output**: Docker image tagged and pushed to registry (e.g., Docker Hub)
32+
33+
**Environment Integration**:
34+
35+
- Docker image tag becomes an input variable for environment configuration
36+
- Different environments can use different image versions (e.g., `latest` for
37+
development, `v1.2.3` for production)
38+
39+
**Automation Status**: ✅ Fully automated
40+
41+
**Example Tags**:
42+
**Expected Outputs**:
43+
44+
- `torrust/torrust-tracker:latest` - Latest development build
45+
- `torrust/torrust-tracker:v1.2.3` - Tagged release build
46+
- `torrust/torrust-tracker:staging` - Staging environment build
47+
48+
**Automation Level**: Fully automated through CI/CD (triggered by git tag creation)
49+
50+
#### 1.2 Generate Golden VM Image
51+
52+
**Purpose**: Create base virtual machine image with pre-installed system dependencies.
53+
54+
**Execution Method**: Manual process with scripted automation
55+
56+
**Trigger**: System dependency updates (infrequent)
57+
58+
**Output**: VM image/ISO with pre-configured base system
59+
60+
**Contents**:
61+
62+
- Base operating system (Ubuntu 24.04 LTS)
63+
- Docker and Docker Compose (current stable versions)
64+
- System dependencies and security updates
65+
- Performance optimizations and system tuning
66+
67+
**Update Frequency**:
68+
69+
- **Rarely** - Only when updating fundamental system components
70+
- Typically 2-4 times per year or for security patches
71+
72+
**Automation Status**: 🔄 Semi-automated (manual trigger, scripted execution)
73+
74+
**Benefits**:
75+
76+
- Faster environment provisioning (pre-installed dependencies)
77+
- Consistent base system across all environments
78+
- Reduced network bandwidth during deployment
79+
- Improved security posture with pre-hardened images
80+
81+
### Phase 2: Environment Provisioning + Application Deployment (Environment-Specific)
82+
83+
These stages execute for each individual environment with environment-specific configuration.
84+
85+
#### 2.1 Infrastructure Provisioning
86+
87+
**Purpose**: Create and configure the infrastructure resources needed for the environment.
88+
89+
**Stages**:
90+
91+
1. **Initialize**: Prepare infrastructure automation tools and validate configuration
92+
93+
- Terraform/OpenTofu initialization
94+
- Provider authentication verification
95+
- Configuration validation and syntax checking
96+
97+
2. **Plan**: Generate execution plan showing what resources will be created/modified
98+
99+
- Resource dependency analysis
100+
- Cost estimation (for cloud providers)
101+
- Change impact assessment
102+
- Security configuration review
103+
104+
3. **Apply**: Create the actual infrastructure resources
105+
- Virtual machine provisioning
106+
- Network configuration and firewall rules
107+
- Storage allocation and backup setup
108+
- DNS record creation (if applicable)
109+
110+
**Environment Variables**: Provider context, resource specifications, regional settings
111+
112+
**Output**: Running virtual machine with base system ready for application deployment
113+
114+
**Idempotency**: Can be re-executed safely; only applies necessary changes
115+
116+
#### 2.2 Application Deployment
117+
118+
**Purpose**: Install and configure the Torrust Tracker application on provisioned infrastructure.
119+
120+
**Execution Method**: Automated deployment scripts
121+
122+
**Process**:
123+
124+
- Application repository checkout/update
125+
- Environment-specific configuration generation
126+
- Docker Compose service orchestration
127+
- Service startup and dependency resolution
128+
129+
**Input Dependencies**:
130+
131+
- Provisioned virtual machine from stage 2.1
132+
- Docker image from stage 1.1
133+
- Environment-specific configuration
134+
135+
**Output**: Running Torrust Tracker with all supporting services
136+
137+
**Services Deployed**:
138+
139+
- Torrust Tracker (HTTP/UDP endpoints)
140+
- MySQL database with schema initialization
141+
- Nginx reverse proxy with SSL configuration
142+
- Prometheus metrics collection
143+
- Grafana monitoring dashboards
144+
145+
#### 2.3 Post-Deployment Configuration
146+
147+
**Purpose**: Complete environment setup with additional configuration and validation.
148+
149+
**Substages**:
150+
151+
1. **Extra Configuration**
152+
153+
- SSL certificate generation/installation
154+
- Domain-specific configuration
155+
- Backup automation setup
156+
- Monitoring alert configuration
157+
158+
2. **Health Checks**
159+
160+
- Service connectivity validation
161+
- API endpoint testing
162+
- Database connectivity verification
163+
- SSL certificate validation
164+
165+
3. **End-to-End Testing**
166+
- Complete tracker functionality validation
167+
- Performance benchmarking
168+
- Security configuration verification
169+
- Integration testing with external systems
170+
171+
**Execution Types**:
172+
173+
- **Automated**: Health checks, basic connectivity tests
174+
- **Semi-automated**: SSL certificates (scripts with manual verification)
175+
- **Manual**: Advanced security configuration, performance tuning
176+
177+
## Workflow Execution Patterns
178+
179+
### Development Workflow
180+
181+
```text
182+
[Phase 1] → [Phase 2.1] → [Phase 2.2] → [Phase 2.3]
183+
↓ ↓ ↓ ↓
184+
Skip Quick Fast Basic
185+
(use latest) provision deploy validation
186+
```
187+
188+
**Optimization**: Skip Phase 1 (use existing images), focus on rapid iteration
189+
190+
### Staging Workflow
191+
192+
```text
193+
[Phase 1] → [Phase 2.1] → [Phase 2.2] → [Phase 2.3]
194+
↓ ↓ ↓ ↓
195+
Specific Production Complete Full
196+
tag/version specs deploy testing
197+
```
198+
199+
**Focus**: Production-like configuration with comprehensive testing
200+
201+
### Production Workflow
202+
203+
```text
204+
[Phase 1] → [Phase 2.1] → [Phase 2.2] → [Phase 2.3]
205+
↓ ↓ ↓ ↓
206+
Release High-avail Blue/green Extensive
207+
version infrastructure deployment validation
208+
```
209+
210+
**Emphasis**: Maximum reliability, security, and validation
211+
212+
## Stage Dependencies
213+
214+
### Sequential Dependencies
215+
216+
- **Phase 2.1****Phase 2.2**: Infrastructure must exist before application deployment
217+
- **Phase 2.2****Phase 2.3**: Application must be running before post-deployment configuration
218+
219+
### Input Dependencies
220+
221+
- **Phase 2.2** requires Docker image from **Phase 1.1**
222+
- **Phase 2.1** may use golden image from **Phase 1.2** (optional optimization)
223+
- **Phase 2.3** requires services from **Phase 2.2** to be healthy
224+
225+
### Parallel Execution Opportunities
226+
227+
- **Phase 1.1** and **Phase 1.2** can execute independently
228+
- Multiple **Phase 2** workflows can execute simultaneously for different environments
229+
- Within **Phase 2.3**, some configurations can be parallelized
230+
231+
## Error Handling and Recovery
232+
233+
### Stage Failure Recovery
234+
235+
**Phase 1 Failures**:
236+
237+
- Image build failures → Fix source code/dependencies, retry build
238+
- Golden image failures → Debug system configuration, manual intervention
239+
240+
**Phase 2.1 Failures**:
241+
242+
- Infrastructure errors → Review provider quotas, fix configuration, retry
243+
- Network/DNS issues → Verify provider settings, update configuration
244+
245+
**Phase 2.2 Failures**:
246+
247+
- Application startup → Check service dependencies, review logs, retry deployment
248+
- Configuration errors → Validate environment settings, fix templates
249+
250+
**Phase 2.3 Failures**:
251+
252+
- SSL certificate issues → Debug DNS/domain configuration, manual intervention
253+
- Health check failures → Investigate service status, review network connectivity
254+
255+
### Rollback Strategies
256+
257+
**Infrastructure Rollback**:
258+
259+
- Terraform/OpenTofu state management for resource cleanup
260+
- Snapshot restoration for critical data preservation
261+
262+
**Application Rollback**:
263+
264+
- Previous Docker image deployment
265+
- Configuration version restoration
266+
- Database migration reversal (if applicable)
267+
268+
## Performance Optimization
269+
270+
### Stage Parallelization
271+
272+
**Development Environments**:
273+
274+
- Multiple developers can provision simultaneously
275+
- Shared golden images reduce provision time
276+
- Local caching of Docker images
277+
278+
**CI/CD Pipeline**:
279+
280+
- Parallel environment provisioning for different test suites
281+
- Artifact caching between stages
282+
- Resource pooling for temporary environments
283+
284+
### Resource Management
285+
286+
**Infrastructure Efficiency**:
287+
288+
- Shared provider contexts for cost optimization
289+
- Resource scheduling for non-production environments
290+
- Automatic cleanup of temporary/expired environments
291+
292+
**Application Optimization**:
293+
294+
- Docker layer caching
295+
- Configuration template pre-processing
296+
- Health check optimization for faster validation
297+
298+
## Related Documentation
299+
300+
- [Core Concepts and Terminology](core-concepts-and-terminology.md) - Fundamental definitions
301+
- [Three-Phase Deployment Architecture](three-phase-deployment-architecture.md) - Architectural principles
302+
- [Environment Configuration Management](environment-configuration-management.md) - Configuration handling
303+
304+
## Revision History
305+
306+
- **v1.0** - Initial deployment workflow definition based on PoC implementation analysis

0 commit comments