Skip to content

Issues: tikv/pd

New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Assignee
Filter by who’s assigned
Sort

Issues list

keyspace: Async pre alloc keyspaces dco-signoff: yes Indicates the PR's author has signed the dco. do-not-merge/needs-linked-issue release-note Denotes a PR that will be considered when it comes time to generate release notes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#9019 opened Jan 24, 2025 by pingyu Loading…
controller: try use atomic replace the lock dco-signoff: yes Indicates the PR's author has signed the dco. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#8968 opened Jan 3, 2025 by nolouch Draft
region: check if the query startkey and endkey specify an uncovered region dco-signoff: yes Indicates the PR's author has signed the dco. ok-to-test Indicates a PR is ready to be tested. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#8790 opened Nov 7, 2024 by Jackl9u Loading…
scheduler: add metrics when there is potential reverse dco-signoff: yes Indicates the PR's author has signed the dco. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#8741 opened Oct 23, 2024 by lhy1024 Loading…
*: reset config if the input is invalid (#8632) cherry-pick-approved Cherry pick PR approved by release team. dco-signoff: yes Indicates the PR's author has signed the dco. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-6.5 This PR is cherry-picked to release-6.5 from a source PR.
#8661 opened Sep 24, 2024 by ti-chi-bot Loading…
*: reset config if the input is invalid (#8632) cherry-pick-approved Cherry pick PR approved by release team. dco-signoff: yes Indicates the PR's author has signed the dco. needs-1-more-lgtm Indicates a PR needs 1 more LGTM. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. type/cherry-pick-for-release-6.1 This PR is cherry-picked to release-6.1 from a source PR.
#8662 opened Sep 24, 2024 by ti-chi-bot Loading…
client: Support both sync and async interface for tsoStream, to avoid potential performane regression when concurrent RPC is not enabled dco-signoff: yes Indicates the PR's author has signed the dco. do-not-merge/needs-linked-issue do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#8636 opened Sep 18, 2024 by MyonKeminta Draft
*: add leak check to the main package dco-signoff: yes Indicates the PR's author has signed the dco. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#8043 opened Apr 9, 2024 by rleungx Loading…
mcs: register tso allocator dco-signoff: yes Indicates the PR's author has signed the dco. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#7891 opened Mar 7, 2024 by rleungx Loading…
tests: remove leak option do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#7777 opened Jan 30, 2024 by HuSharp Draft
*: limit region count do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#7100 opened Sep 14, 2023 by overvenus Draft
schedule: enlarge store limit when preparing store do-not-merge/needs-linked-issue do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#6908 opened Aug 8, 2023 by rleungx Draft
GC safe point v2 support global service safe point do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-ok-to-test Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note Denotes a PR that will be considered when it comes time to generate release notes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#6851 opened Jul 26, 2023 by ystaticy Draft
mcs, tso: create global tso state view and apply to discovery, monitoring, etc. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. release-note-none Denotes a PR that doesn't merit a release note. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#6525 opened May 25, 2023 by binshi-bing Draft
ProTip! Adding no:label will show everything without a label.