Skip to content

Issues: red-hat-storage/ocs-ci

New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Assignee
Filter by who’s assigned
Sort

Issues list

Download subctl downstream unreleased binary DR Metro and Regional DR related PRs size/M PR that changes 30-99 lines team/ecosystem Ecosystem team related issues/PRs
#11063 opened Dec 18, 2024 by shylesh Loading…
[release-4.17] Check for Kube Object Sync time before running failover for Discovered Apps DR Metro and Regional DR related PRs size/M PR that changes 30-99 lines Verified Mark when PR was verified and log provided
#11054 opened Dec 16, 2024 by openshift-cherrypick-robot Loading…
Improve getting vrg name for Discovered Apps DR Metro and Regional DR related PRs size/M PR that changes 30-99 lines
#11015 opened Dec 9, 2024 by prsurve Loading…
[DND] Discovered apps with cephfs DO NOT MERGE Do not merge this change!! DR Metro and Regional DR related PRs needs-rebase size/L PR that changes 100-499 lines Squad/Turquoise
#11013 opened Dec 9, 2024 by prsurve Loading…
Download subctl dynamically for downstream_unreleased version DR Metro and Regional DR related PRs team/ecosystem Ecosystem team related issues/PRs
#10963 opened Dec 2, 2024 by shylesh
Update RDR tier4 tests do-not-merge/work-in-progress DR Metro and Regional DR related PRs needs-rebase size/L PR that changes 100-499 lines
#10276 opened Aug 9, 2024 by sidhant-agrawal Draft
Test Verify hub restore to passive hub following failover and relocate of app DR Metro and Regional DR related PRs size/L PR that changes 100-499 lines Squad/Turquoise
#9596 opened Apr 1, 2024 by prsurve Loading…
Mdr upgrade scenario DR Metro and Regional DR related PRs Needs Testing Run tests and provide logs link size/XXL team/ecosystem Ecosystem team related issues/PRs
#8699 opened Oct 17, 2023 by shylesh Loading…
RDR - Sequential failover from UI DR Metro and Regional DR related PRs lifecycle/keepalive Do not label as stale Needs Testing Run tests and provide logs link needs-rebase size/M PR that changes 30-99 lines Test Case A test case PR
#8697 opened Oct 17, 2023 by jilju Loading…
[RDR] Sequential failover/relocate of different workloads via ACM UI DR Metro and Regional DR related PRs lifecycle/keepalive Do not label as stale needs-rebase size/L PR that changes 100-499 lines
#7703 opened May 25, 2023 by am-agrawa Loading…
Submariner log collection fails when running RDR MultiCluster job on existing setup bug Something isn't working DR Metro and Regional DR related PRs lifecycle/keepalive Do not label as stale team/ecosystem Ecosystem team related issues/PRs
#7687 opened May 24, 2023 by sidhant-agrawal
ProTip! Find all open issues with in progress development work with linked:pr.