Skip to content

Issues: pingcap/docs-cn

New issue

Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.

By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.

Already on GitHub? Sign in to your account

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Assignee
Filter by who’s assigned
Sort

Issues list

Add the notice for deprecating optimistic transaction do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. size/S Denotes a PR that changes 10-29 lines, ignoring generated files. status/LGT2 Indicates that a PR has LGTM 2. translation/done This PR has been translated from English into Chinese and updated to pingcap/docs-cn in a PR.
#14066 opened May 29, 2023 by you06 Loading…
4 of 16 tasks
sql-statement: update sql-statement-change-column area/sql-infra Indicates that the Issue or PR belongs to the area of sql-infra and sql-metadata. needs-cherry-pick-release-6.1 Should cherry pick this PR to release-6.1 branch. needs-cherry-pick-release-6.5 Should cherry pick this PR to release-6.5 branch. needs-cherry-pick-release-7.1 Should cherry pick this PR to release-7.1 branch. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. requires-version-specific-changes After cherry-picked, the cherry-picked PR requires further changes. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. status/LGT2 Indicates that a PR has LGTM 2. translation/doing This PR’s assignee is translating this PR. type/enhancement The issue or PR belongs to an enhancement.
#13817 opened Apr 26, 2023 by HuSharp Loading…
1 task done
doc: add witness related docs area/scheduling Indicates that the Issue or PR belongs to the area of scheduling. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. for-future-release This PR only applies to master for now and might cherry-pick to a future release. size/L Denotes a PR that changes 100-499 lines, ignoring generated files. status/LGT2 Indicates that a PR has LGTM 2. translation/done This PR has been translated from English into Chinese and updated to pingcap/docs-cn in a PR. type/compatibility-or-feature-change This PR involves compatibility changes or feature behavior changes.
#12628 opened Jan 10, 2023 by ethercflow Draft
3 tasks done
ProTip! no:milestone will show everything without a milestone.