Generation Expansion Planning (GEP) models considering uncertainties on renewable energy resources (RES)
The following files solve the GEP problem for three scenarios of wind and solar production using different approaches:
- Stochastic-GEP.gms: Two-Stage Stochastic Generation Expansion Planning
- Stochastic-GEP-Benders.gms: Two-Stage Stochastic Generation Expansion Planning - Using Benders
- Stochastic-GEP-Benders-Multicut.gms: Two-Stage Stochastic Generation Expansion Planning - Using Benders Multicut
- Stochastic-GEP-LR.gms: Two-Stage Stochastic Generation Expansion Planning - Using Lagrangian Relaxation (LR)
- Stochastic-GEP-Multistage.gms: Multi-Stage Stochastic Generation Expansion Planning
- SRO-GEP.gms: Single-Stage Static Robust Optimization (SRO) or Scenario-based RO -Generation Expansion Planning (GEP)
- ARO-GEP.gms: Two-Stage Adaptive Robust Optimization (ARO)-Generation Expansion Planning (GEP)
- WCS-GEP.gms: Worst Case Scenario -Generation Expansion Planning (GEP)
- Bilevel-Centralized-GEPM.gms: The Bilevel formulation Deterministic Single-Node Static Generation Expansion Planning Model (GEPM)
The models are developed in GAMS and solved with CPLEX, but you could use any other solver (e.g., GUROBI, Cbc).
Name | Description |
---|---|
time periods | |
generation technologies | |
subset of renewable techonologies | |
scenarios |
Name | Domains | Description |
---|---|---|
Value of Lost Load [$/MWh] | ||
Representative period weight [hours] | ||
Investment cost [$/MW] | ||
Variable production cost [$/MWh] | ||
Capacity per each invested unit [MW/unit] | ||
Renewable profile (e.g., load factor) [p.u.] | ||
Demand [MW] | ||
Scenario probability [p.u.] |
Name | Domains | Description |
---|---|---|
Total system cost [$] | ||
Total investment cost [$] | ||
Total operating cost [$] | ||
Generation investment [1..N] | ||
Generation production [MW] | ||
Loss of load [MW] |
Name | Domains | Description |
---|---|---|
eObjFun | Total system cost [$] | |
eInvCost | Total investment cost [$] | |
eOpeCost | Total operating cost [$] | |
eBalance | Power system balance [MWh] | |
eMaxProd | Maximum generation production [MW] | |
eRenProd | Maximum renewable production [MW] |
The main references to model the optimization problems are: