Skip to content

Merge pull request #140 from authzed/api-change/v1.45.0 #346

Merge pull request #140 from authzed/api-change/v1.45.0

Merge pull request #140 from authzed/api-change/v1.45.0 #346

Triggered via push August 27, 2025 20:58
Status Failure
Total duration 50s
Artifacts

build.yaml

on: push
Matrix: build
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
Java 8 Build
Process completed with exit code 1.
Java 21 Build
Process completed with exit code 1.
Java 24 Build
The operation was canceled.
Java 24 Build
The strategy configuration was canceled because "build._8" failed
Java 8 Test
Process completed with exit code 1.
Java 21 Test
Process completed with exit code 1.
Java 21 Test
The strategy configuration was canceled because "test._8" failed
Java 24 Test
The operation was canceled.
Java 24 Test
The strategy configuration was canceled because "test._8" failed