You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
[SPARK-26109][WEBUI] Duration in the task summary metrics table and the task table are different
## What changes were proposed in this pull request?
Task summary table displays the summary of the task table in the stage page. However, the 'Duration' metrics of 'task summary' table and 'task table' are not matching. The reason is because, in the 'task summary' we display 'executorRunTime' as the duration, and in the 'task table' the actual duration of the task. Except duration metrics, all other metrics are properly displaying in the task summary.
In Spark2.2, used to show 'executorRunTime' as duration in the 'taskTable'. That is why, in summary metrics also the 'exeuctorRunTime' shows as the duration. So, we need to show 'executorRunTime' as the duration in the tasks table to follow the same behaviour as the previous versions of spark.
## How was this patch tested?
Before patch:

After patch:

Closes#23081 from shahidki31/duratinSummary.
Authored-by: Shahid <shahidki31@gmail.com>
Signed-off-by: Sean Owen <sean.owen@databricks.com>
(cherry picked from commit 540afc2)
Signed-off-by: Sean Owen <sean.owen@databricks.com>
0 commit comments