Replies: 1 comment 5 replies
-
|
hello, @kimminw00 |
Beta Was this translation helpful? Give feedback.
5 replies
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Uh oh!
There was an error while loading. Please reload this page.
Uh oh!
There was an error while loading. Please reload this page.
-
If I enable the DAG using the CronTriggerTimetable at 3PM on November 15th, CronTriggerTimetable immediately trigger a new DAG run which is supposed to trigger at 12AM on November 15th.
From the above lines, I think that CronTriggerTimetable should trigger a new DAG run at 12AM on November 16th and not immediately trigger a new DAG run which is supposed to trigger at 12AM on November 15th. Is there something I missed?
Environment
Airflow 2.7.2
Reference
https://airflow.apache.org/docs/apache-airflow/stable/authoring-and-scheduling/timetable.html#the-time-when-a-dag-run-is-triggered
Beta Was this translation helpful? Give feedback.
All reactions