Skip to content

Latest commit

 

History

History
101 lines (60 loc) · 2.79 KB

v3-29-aave-v3-bnb-set-aave-chan-initiative-as-emission-manager-for-fdusd.md

File metadata and controls

101 lines (60 loc) · 2.79 KB

Proposal 29. Set Aave Chan Initiative as Emission Manager for fdUSD on BNB Chain Aave V3.


Voting link

https://vote.onaave.com/proposal/?proposalId=29


Governance forum discussion

https://governance.aave.com/t/arfc-set-aave-chan-initiative-as-emission-manager-for-fdusd-on-bnb-chain-aave-v3/16558


Payloads


Certora analysis


Proposal types

🤝 permission granting or revoking


Context

This proposal registers the Aave Chan Initiative wallet as Emission Manager for fdUSD on BNB Chain Aave V3 in order to promote growth and expand the user base of Aave on the BNB Chain.


Proposal creation

Transaction: https://etherscan.io/tx/0x8b16bc6b691d79987a029ae84397517a1d5061086de7e31ef5ae89bcb6e5b576

- proposalId: 29
- creator: 0x57ab7ee15ce5ecacb1ab84ee42d5a9d0d8112922
- accessLevel: 1
- ipfsHash: 0x9312b025853064cf395dbf32add123bdd419b0216457d59fd3941db89890c814

createProposal() parameters

{
  "payloads": [
    {
      "chain": "56",
      "accessLevel": 1,
      "payloadsController": "0xE5EF2Dd06755A97e975f7E282f828224F2C3e627",
      "payloadId": "4"
    },
  ],
  "votingPortal": "0x9b24C168d6A76b5459B1d47071a54962a4df36c3",
  "ipfsHash": "0x9312b025853064cf395dbf32add123bdd419b0216457d59fd3941db89890c814"
}

Aave Seatbelt report

Proposal report

https://github.com/bgd-labs/seatbelt-gov-v3/blob/main/reports/proposals/29.md

Payload reports


Technical analysis

We have verified that the payload registers the Aave Chan Initiative wallet as Emission Manager for fdUSD on BNB Chain Aave V3.


The proposal is consistent with the description on both Snapshot and the governance forum.


Certora validations

✅ The code on the proposal payload corresponds to the proposal specification.

✅ The proposal includes a proper tests suite, checking all necessary post-conditions.

✅ BGD reviewed the payload before the proposal was submitted.

✅ Certora reviewed the procedure followed to submit the proposal.