  • Create a complete-test Jtest suite to validate the functionality of the controller systems.

    Overdue by 10 year(s)
    Due by November 25, 2014
    0/1 issues closed
  • Implement a PID solver for taking in an end-effector velocity and determining the joint parameters of the system, based on the hardware configuration XML file. Update rate is to be greater than 30 frames per second.

    Overdue by 10 year(s)
    Due by November 20, 2014
    0/1 issues closed
  • Implement a solver for taking in an end-effector position and determining the joint parameters of the system, based on the hardware configuration XML file.

    Overdue by 10 year(s)
    Due by November 10, 2014
    0/1 issues closed