Skip to content

Commit cbf629e

Browse files
committed
Update surface-pro-12in-component-disassembly-and-reassembly.md
1 parent 1fdd822 commit cbf629e

File tree

1 file changed

+3
-4
lines changed

1 file changed

+3
-4
lines changed

surface/service-guides/surface-pro-12in-component-disassembly-and-reassembly.md

Lines changed: 3 additions & 4 deletions
Original file line numberDiff line numberDiff line change
@@ -445,7 +445,7 @@ Required Tools
445445
:::image type="content" source="./images/Surface_Pro_12in/Pro12_Repair/media/image29.png" alt-text="remove Conductive tape 2":::
446446

447447
2. Remove the two screws
448-
(:::image type="icon" source="./images/Surface_Pro_12in/Pro12_Repair/media/image17.png" alt-text="Battery wayfindinge.":::)
448+
(:::image type="icon" source="./images/Surface_Pro_12in/Pro12_Repair/media/image17.png" alt-text="Battery wayfinding.":::)
449449
Securing the battery connector bracket using a 3IP screwdriver and remove the bracket.
450450

451451
:::image type="content" source="./images/Surface_Pro_12in/Pro12_Repair/media/image30.png" alt-text="A screwdriver on a device.":::
@@ -793,7 +793,7 @@ Required Tools
793793
- M1.2 x L1.5 3IP (Battery Bracket Screws)
794794
:::image type="icon" source="./images/Surface_Pro_12in/Pro12_Repair/media/image17.png" alt-text="Battery connector bracket screw."::: – M1334202/203-001
795795

796-
- M1.6 \* L2.3 3IP (Battery Frame Screws)
796+
- M1.6 x L2.3 3IP (Battery Frame Screws)
797797
:::image type="icon" source="./images/Surface_Pro_12in/Pro12_Repair/media/image51.png" alt-text="Battery frame screw."::: – M1341578/79-001
798798

799799
### Procedure Preparation Battery
@@ -830,8 +830,7 @@ Required Tools
830830
1. **Remove the Display Module –** Debond the Display using the
831831
Surface Debonding Tool. Remove the TDM shield lid and disconnect the
832832
battery connector
833-
(:::image type="icon" source="./images/Surface_Pro_12in/Pro12_Repair/media/image17.png" alt-text="Battery connector bracket screw.":::) from the Motherboard to
834-
ensure complete battery shutoff. Refer to [Procedure Removal
833+
(:::image type="icon" source="./images/Surface_Pro_12in/Pro12_Repair/media/image17.png" alt-text="Battery connector bracket screw.":::) from the Motherboard to ensure complete battery shutoff. Refer to [Procedure Removal
835834
Display](#procedure-removal-display) for detailed instructions.
836835

837836
2. **Remove the Battery Screws** – Remove the 7 screws

0 commit comments

Comments
 (0)