Skip to content

major: upgrade to fastify v5 #40

major: upgrade to fastify v5

major: upgrade to fastify v5 #40

Triggered via pull request September 18, 2024 05:30
@EommEomm
synchronize #11
v5
Status Failure
Total duration 53s
Artifacts

ci.yml

on: pull_request
Matrix: test / Test
test  /  Test Fastify Integration
0s
test / Test Fastify Integration
test  /  Dependency Review
5s
test / Dependency Review
test  /  Check Licenses
0s
test / Check Licenses
test  /  Lint Code
25s
test / Lint Code
test  /  Automerge Dependabot PRs
0s
test / Automerge Dependabot PRs
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test / Test (20, ubuntu-latest)
Process completed with exit code 1.
test / Test (20, macos-latest)
The job was canceled because "_20_ubuntu-latest" failed.
test / Test (20, macos-latest)
Process completed with exit code 1.
test / Test (22, ubuntu-latest)
The job was canceled because "_20_ubuntu-latest" failed.
test / Test (22, ubuntu-latest)
Process completed with exit code 1.
test / Test (20, windows-latest)
The job was canceled because "_20_ubuntu-latest" failed.
test / Test (20, windows-latest)
The operation was canceled.
test / Test (22, windows-latest)
The job was canceled because "_20_ubuntu-latest" failed.
test / Test (22, windows-latest)
The operation was canceled.
test / Test (22, macos-latest)
The job was canceled because "_20_ubuntu-latest" failed.
test / Test (22, macos-latest)
The operation was canceled.