Repository navigation
docs(plans): archive phase 80-84 + harness.toml version drift fix - #180
Conversation
v4.13.1 release closeout 時の同期漏れ。VERSION / plugin.json / marketplace.json / codex-plugin / cursor-plugin は 4.13.1 だが harness.toml だけ 4.13.0 のままだったため、check-consistency.sh で version drift として検出された。 Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Phase 80/81/82/84 を .claude/memory/archive/Plans-2026-05-29-phase80-84.md へ抽出 (Plans.md 235 → 171 行、200 行制限内に復帰)。Phase 83 は 83.7 deferred (Cursor hook deny live test は CC 再起動後)、Phase 85 は recency window のため live Plans.md に残す。 Phase 85.3 closeout タスクが cc:todo のまま残置されていた drift を cc:done [e058e3c] に修正。Pattern parity with 84.5 (uses closeout commit, not the v4.13.1 release commit f7a1f9d). Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
|
Codex usage limits have been reached for code reviews. Please check with the admins of this repo to increase the limits by adding credits. |
|
Caution Review failedThe pull request is closed. ℹ️ Recent review info⚙️ Run configurationConfiguration used: Organization UI Review profile: CHILL Plan: Pro Run ID: 📒 Files selected for processing (2)
WalkthroughPhase 80~84 の計画をアーカイブドキュメントとして新規作成し、Plans.md の参照リンク構造を更新。Phase 85.3 の進捗ステータスを完了にマーク。 Changes計画進捗の記録化と参照整備
Estimated code review effort🎯 2 (Simple) | ⏱️ ~12 分 Possibly related PRs
Poem
🚥 Pre-merge checks | ✅ 5✅ Passed checks (5 passed)
✏️ Tip: You can configure your own custom pre-merge checks in the settings. ✨ Finishing Touches🧪 Generate unit tests (beta)
Thanks for using CodeRabbit! It's free for OSS, and your support helps us grow. If you like it, consider giving us a shout-out. Comment |
Conflict resolution: - Plans.md: Phase 82 → 86 (Harness Duplication Cleanup), Phase 83 → 87 (Cursor Internal-Compatible Promotion). Renumbered to avoid collision with the archived Phase 80-84 numbering space (main is at 4.13.1 + PR #180 archive). - CHANGELOG.md: integrated Removed (#170 scaffolder) + Fixed (#171 no-verify bypass, #178 harness.toml drift) from main, plus PR #174's Changed entries with Phase 86/87 references. - docs/research/cursor-adapter-candidate.md: adopted origin/main content (PR #180's network smoke / write-capability / containment / ACP not adopted research). - docs/bootstrap-routing-contract.md:119: "Phase 83" → "Phase 87". - spec.md:3: "Phase 72 through Phase 83" → "Phase 72 through Phase 87". Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Summary
.claude/memory/archive/Plans-2026-05-29-phase80-84.mdへ抽出(200 行制限内に復帰)cc:todo→cc:done [e058e3ca](pattern parity with 84.5 / uses closeout commit, not release commit)check-consistency.shで検出)Phase 83 は 83.7 deferred(Cursor hook deny live test は CC 再起動後)のため live Plans.md に残す。Phase 85 は recency window で live に残す。
Before / After
Commits
Test plan
🤖 Generated with Claude Code
Summary by CodeRabbit
リリースノート
注記: このリリースには、エンドユーザーに目に見える変更はありません。