Skip to content

Latest commit

 

History

History
59 lines (36 loc) · 3.08 KB

developer_documentation.md

File metadata and controls

59 lines (36 loc) · 3.08 KB

Developer Documentation for MultiverseNote

Project Roadmap

Welcome to the MultiverseNote Developer Documentation. This document outlines the roadmap for the project, detailing stages and key milestones that will guide our development from inception to the full release.

Overview

MultiverseNote aims to transform AI chatbot interactions into structured project management workflows. The development is structured into several key phases, each building upon the previous to gradually increase functionality and user engagement.

Phase 1: Minimum Viable Product (MVP)

Objective: Establish basic functionality using React Native to handle simple project management tasks and branching dialogues.

  • Frontend: Develop the initial user interface using React Native without a backend integration. Focus on basic app components such as project listing, branch creation, and basic navigation.
  • Core Features: User authentication, project creation, and simple branching mechanics.
  • Timeline: Q3 2024

Phase 2: Utools Plugin

Objective: Extend functionality by integrating with Utools to provide enhanced utility through plugins.

  • Plugin Development: Create a plugin for Utools that allows users to interact with MultiverseNote directly from other tools.
  • Integration Testing: Ensure seamless functionality between the plugin and the main app.
  • Timeline: Q4 2024

Phase 3: Terminal Application

Objective: Develop a terminal-based application for advanced users who prefer command-line tools over graphical interfaces.

  • Backend Setup: Establish a simple server using Node.js to handle API requests.
  • CLI Development: Implement a command-line interface that mirrors the functionality of the GUI.
  • Timeline: Q1 2025

Phase 4: Full Frontend Development

Objective: Enhance the frontend with more advanced features and prepare for backend integration.

  • Advanced UI/UX: Implement more sophisticated UI elements and user interaction capabilities.
  • Performance Optimization: Enhance application responsiveness and data handling.
  • Timeline: Q2 2025

Phase 5: Full Backend Development

Objective: Develop a comprehensive backend system to support extensive project management features.

  • Database Integration: Set up a robust database system to manage complex data and user interactions.
  • Backend Logic: Develop complex backend logic to handle multiple users, extensive data processing, and security measures.
  • Timeline: Q3-Q4 2025

Future Milestones

  • Beta Testing: Involve users in testing the integrated frontend and backend to refine features and UI.
  • Release Candidate: Prepare and polish the final version for public release.
  • Official Launch: Launch the fully integrated system with comprehensive support for multiple platforms.

Conclusion

This roadmap provides a structured approach to developing MultiverseNote, with clear objectives and timelines to guide our progress. By adhering to this plan, we aim to create a robust platform that fulfills the needs of managing AI-enhanced project conversations efficiently.